BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Brooksville, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Multi Sidewalk Repairs Questions will only be accepted through the period specified Friday, March 17, 2023 Join Zoom Meeting https://hernandoclerk.zoom.us/j/94664806689pw d=MWJjNHJSclUrYWh1b1pRTzMvaWk5UT09 Meeting ID: 946 6480 6689 Passcode: 356998 One tap mobile +17209289299,,94664806689#,,,,*356998# US (Denver) +12133388477,,94664806689#,,,,*356998# US (Los Angeles) Dial by your location +1 720 928 9299 US (Denver) +1 213 338 8477 US (Los Angeles) +1 253 215 8782 US (Tacoma) +1 669 219 2599 US (San Jose) Meeting ID: 946 6480 6689 Passcode: 356998 Find your local number: https://hernandoclerk.zoom.us/u/acA12esknN PROJECT DESCRIPTION: A. This project consists of the removal and disposal of damaged sidewalk panels, and the installation of new panels. Installed sidewalks must match pre-existing sidewalks (some areas are five feet wide; others are four feet wide). The construction of sidewalks shall adhere to FDOT Specifications, and Hernando County Ordinances. The panels must be installed with 3,000 psi concrete, either reinforced with wire, and/or with fiber, 4 inches thick. The Panels must not have a cross-slope exceeding 2%. This sidewalk improvement includes setting up proper Management of Traffic, for roadways and sidewalks, installation of ADA Matting, and sodding of the disturbed areas, with all proposed work per the specifications. B. Water meters within concrete panels shall be relocated before removing and installing the accompanied panels. Please coordinate with the project manager/inspector to have meters removed. C. After completion of the new sidewalk installation, all disturbed areas within the County's Right of Way must be re-established. New sod must be installed to all disturbed areas, which may include the entire Right of Way. D. It will be the Vendor/Contractor's responsibility to provide an acceptable MOT plan at the PreConstruction meeting along with a chart showing the project schedule. E. The Vendor/Contractor shall comply with all applicable OSHA workplace safety requirements and shall accomplish the work in a manner providing for the safety of their equipment and workers and for the safety of the general public Bid Result Spring Hill Drive Sidewalk Locations : AJ General Construction Services Inc - $ 47662.3658 Mariner Odd Sidewalk Locations : AJ General Construction Services Inc - $ 65547.4815 Mariner Even Sidewalk Locations : AJ General Construction Services Inc - $ 50224.0959 Northcliffe Sidewalk Locations : AJ General Construction Services Inc - $ 48240.848 Landover Sidewalk Locations : AJ General Construction Services Inc - $ 18142.025 Seven Hills Sidewalk Locations : AJ General Construction Services Inc - $ 14424.2087

Award

Sidewalks / Parking Lot

$244,241.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
66
Bidding Soon
1,274
All Active Projects
515
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

img_map_placeholder

Multiple Locations, Brooksville, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.