BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Yorktown Heights, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Design Build of Upstate Roadway Recon & Improvements. The following Project Description is provided to assist in developing a team with the expertise that is required for the Project. The Design-Builder shall be responsible for the management, design, and construction of the Project. The design and construction by the Design-Builder shall be in accordance with NYCDEP and NYSDOT's guidelines and standards as required by the RFP. DEP's intent is to allow flexibility in design and construction to accommodate processes, procedures, and innovative techniques that are preferred by the Design-Builder, as long as they are consistent with site conditions, good engineering practices, practical solutions, environmental documents and permits, other standards, guidelines, and procedures identified in the RFP and Project Goals. The Scope of Work presented in this RFQ for the Project may or may not be the final Scope of Work presented in the RFP for the Project. The Project Description for this Project is the rehabilitation and/or replacement of roadway, guardrail, culverts, retaining wall, underground storage tanks, electrical transformer and switchgear and sanitary force mains at the following three locations that are part of DEP's Upstate Water Reservoir system. More detailed Scope of Work is provided In Section 1.5. The Project locations are: o New Croton Lake Gate House, Croton Dam Road and Arcady Road 1902 Croton Dam Road Yorktown, NY o Ashokan Reservoir Roads Approx 9.5 miles on New York State Route 28A on the west side of Ashokan Reservoir Olive, NY o Schoharie Reservoir Culverts Two culvert and embankment locations on New York State Route 7 Prattsville, NY The estimated contract price for the Project is estimated to be $69 million - $84 million. 1) New Croton Lake Gate House, Croton Dam Road and Arcady Road: a) Design and reconstruct up to one mile of roadway, including full depth reclamation to accommodate DEP and heavy utility vehicles, emergency access, utility access, and chemical deliveries to the Croton Lake Gate House. Roadway repairs include reconstruction and stabilization of approximately 1,400 linear feet of Arcady Road which has experienced slope failure and partially washed out. b) Design and furnish improved stormwater management along Arcady Road and at the Croton Lake Gate House Plaza, including grading improvements. c) Design and reconstruct asphalt paving throughout the Croton Lake Gate House Plaza. d) Design and perform repairs to the Croton Lake Gate House Plaza Bridge. e) Design, furnish, and replace approximately 1,400 linear feet of 4-inch to 8-inch sanitary force main. f) Design and reconstruct approximately 1,000 linear feet of approximately 36-inch-tall historic retaining wall along Arcady Road. The retaining wall design may be subject to NYC PDC and SHPO approval. g) Design, repair, and repoint up to 500 linear feet of retaining historic retaining wall on Croton Dam Road adjacent to the New Croton Lake Gate House. The fascia / finishes of the retaining wall as well as the grout material may be subject to NYC PDC and SHPO approval and shall preferably match the New Croton Lake Gate House fascia stone. h) Design, furnish, and construct electrical improvements including: i) Provide new 750-1000 kVA transformer and switchgear. ii) Raise electrical manhole lids. iii) Remove and replace underground concrete duct bank conduits for primary power supply and backup power supply. iv) Remove and replace underground concrete duct bank conduits for power and communications to the sanitary sewer grinder pump station on Arcady Road. i) Strip, repaint, and re-set approximately 750 linear feet of historic railing along Croton Dam Road adjacent to the New Croton Lake Gate House. j) Replace two existing Underground Oil Storage Tanks as well as existing electrical and telecommunication utilities within the storage vault. 2) Ashokan Reservoir Roads a) Design and repair approximately 9.5 miles of roadway along Route 28A, including: i) Full depth roadway reclamation to accommodate DEP and the general public. ii) Roadway widening in accordance with NYSDOT standards. iii) Tack coat application. iv) Striping and tree trimming. v) Guiderail replacement and repair. vi) Reconstruction of roadside drainage swales. b) Design and reconstruct, repair, replace, or extend up to 55 culverts crossing below Route 28A. c) Design and implement maintenance and protection of traffic throughout the duration of the construction activities. 3) Schoharie Reservoir Culverts a) Design and construct corrective action (culvert lining or replacement) and repairs to the two (2) culverts under County Road 7 in Greene County at the horseshoe curve area along the east side of the Schoharie Reservoir. b) Design and construct improvements to stabilize the existing embankment. c) Design, construct, and facilitate construction access to the culverts which are located down a steep embankment and potentially in an environmentally sensitive area. d) Design and implement maintenance and protection of traffic throughout the duration of the construction activities. e) Perform full depth roadway reconstruction of County Road 7 in the work area. k) Design and implement maintenance and protection of traffic throughout the duration of the construction activities. M/WBE Participation 30% Design 30% Construction

Post-Bid

Roads / Highways

$84,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
239
Bidding Soon
4,359
All Active Projects
1,973
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2023

July 24, 2024

img_map_placeholder

Multiple Locations, Yorktown Heights, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.