BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Center City, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Approximate Major quantities of work are: 2021.501 MOBILIZATION LUMP SUM 1 2355.506 BITUMINOUS MATERIAL FOR FOG SEAL GALLON 37824 2356.506 BITUMINOUS MATERIAL FOR CHIP SEAL GALLON 94561 2356.604 FA-2 SEAL COAT AGGREGATE SQ YD 378240 2563.601 TRAFFIC CONTROL LUMP SUM 1 2582.503 4" SOLID LINE PAINT LIN FT 40094 2582.503 6" SOLID LINE PAINT LIN FT 168460 2582.503 24" SOLID LINE PAINT LIN FT 1395 2582.503 4" BROKEN LINE PAINT LIN FT 5620 2582.503 4" DBLE SOLID LINE PAINT LIN FT 69509 2582.518 PAVT MSSG PAINT SQ FT 1522 2582.518 CROSSWALK PAINT SQ FT 450 The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of Chisago County shall comply with the provisions of the statute The website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the website electronically. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from other sources. . NO HARD COPY BIDS WILL BE ACCEPTED. No bid will be accepted unlesssubmitted with a bidder's bond payable to the County for not lessthan five (5) per cent of the bid, as a guarantee that the bidder will, within fifteen (15) days after notification of award of contract, enter into an agreement with the County and furnish a performance bond and a payment bond for the full amount of the contract as provided by law. If the bidder, upon the letting of the contract to them, shall fail to enter into the contract, as let, the amount of such bidder's bond shall be forfeited to the County. The County Board reserves the right to reject any or all bids, to waive any informalities therein, and further reserves the right to award the contract in the best interest of the County. The proposed contract issubject to minimum wage rates asset forth by the Minnesota Department of Labor and Industry and incorporated into the Specifications.

Award

Roads / Highways

$738,103.00

Public - County

Paving, Site Work

3

6

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
43
Bidding Soon
780
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2023

April 13, 2023

img_map_placeholder

Multiple Locations, Center City, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.