Site work for a civil project in Drumheller, Alberta. Completed plans call for site work for a bridge / tunnel; water / sewer project; and road / highway.

The Scope of Work for this project shall include, but is not limited to, the following: Stripping/Clearing/Grubbing as required Common Excavation Borrow Excavation – Contractor’s Supply Fill Placement and Compaction to Specifications Culverts – Supply and Install – Various Diameter and Type Screened Topsoil – Supply and Place Seeding / Sodding Heavy Rock Riprap Class 1M and 2 – Supply and Placement Permanent Erosion Protection Care of Water, including but not limited to, river and creek flows, surface water run-off, groundwater, and River Diversion Fish Capture and Release Other Work Unless otherwise specified, the Contractor shall supply all materials necessary to complete the Work. A complete job is called for, therefore any labour, material, equipment, tool or incidental item not specifically mentioned but necessary for completeness will be considered incidental to the Work and no separate or additional payment will be made. The work for this Project will be completed in 2 Phases. Phase 1 works are scheduled to commence in July 2023, pending receipt of regulatory approvals and authorizations. The Contractor shall schedule their operations to complete Phase 1 Work (not including landscaping and instream works including riprap placement) by November 30, 2023. Phase 1 landscaping works must be completed by May 31, 2024. Phase 1 instream works must be completed prior to April 15, 2024 (if conditions allow) or by November 30, 2024 if conditions do not allow. The Contractor shall schedule their operations to complete Phase 2 (all of the Work under this Contract) by November 30, 2024. The Contractor will be informed when Phase 2 work can begin but is currently scheduled to commence Spring 2024. Commencement of Phase 1 and Phase 2 works are subject to the Town receiving regulatory approvals and permits along with completing necessary land acquisition to complete the work. Documents can be obtained from https://www.drumheller.ca/do-business/tenders

Award

Water / Sewer

$3,657,442.00

Public - City

Site Work

33

6

12

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
51
All Active Projects
16
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Drumheller, AB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.