EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Columbia, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

City of Columbia Moorhead Construction, Inc. is requesting quotes from Minority and Women Business Enterprises to respond to this advertisement for work related to the Upper Kinley Creek SS Improvements Project. Hauling, Surveying, Traffic Control, Landscaping, Utility Relocation, Sewer Main Installation, Curb and Gutter, Service Lateral Connections, Riprap with Geotextile Fabric, Aggregate materials, Abandonment and Demo of Existing Sewer, Jack and Bore, Fencing, Storm Drain Replacement and materials and related appurtenances. Moorhead Construction, Inc. is an equal opportunity employer and will negotiate in good faith with anyone that is interested in quoting this project. Moorhead Construction, Inc. does not discriminate in hiring subcontractors based on race, creed, color, religion, ancestry, sex, sexual orientation, or national origin. We will take affirmative steps to assure against discrimination. Interested bidders may contact Katie Thompson at 864-338-0888 or office@moorheadconstruction.com. Moorhead Construction, Inc. can offer assistance with bonding and insurance requirements. Moorhead Construction, Inc. does not discriminate in hiring subcontractors based on race, creed, color, religion, ancestry, sex, sexual orientation, or national origin. We will take affirmative steps to assure against discrimination. All CDBEs/DBEs to be contracted must self-perform a minimum of 50% of their portion of the project. total construction time of three hundred (300) consecutive calendar day Furnish all labor, material, equipment, and incidentals required to construct and install the approximately 5,600 linear feet of 24-inch gravity sewer, 20 linear feet of 18-inch gravity sewer, 90 linear feet of 15-inch gravity sewer, 115 linear feet of 10-inch gravity sewer and 20 linear feet of 8-inch gravity sewer which includes 42 new manholes, and all associated appurtenances in its entirety as shown on the Drawings and as specified herein. The Work includes, but is not necessarily limited to, the following: 1. Clear the site of trees, brush, fences, buildings and obstructions occupying space needed for construction. No building or structure partially encroaching on the right-of-way or located so as not to interfere with construction operations, shall be removed unless specifically noted on the Drawings or directed by the Engineer. 2. Installation of the Sanitary Sewer System and restoration of work zone as shown on construction drawing . pre-Bid- Dial by your location +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 646 931 3860 US +1 929 205 6099 US (New York) +1 301 715 8592 US (Washington DC) +1 305 224 1968 US +1 669 444 9171 US +1 669 900 6833 US (San Jose) +1 689 278 1000 US +1 719 359 4580 US +1 253 205 0468 US +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 360 209 5623 US +1 386 347 5053 US +1 507 473 4847 US +1 564 217 2000 US Meeting ID: 835 1543 0002 Passcode: 912094 Find your local number: https://us02web.zoom.us/u/kt295R2ea 13% CDBE participation Question Deadline 03/27/2023 All questions must be submitted to: https://columbiasc.ionwave.net

Bid Results

Water / Sewer

$4,780,814.00

Public - City

Paving, Site Work

42

32

10

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Bituminous Dampproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
66
Bidding Soon
855
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

May 8, 2023

img_map_placeholder

Multiple Locations, Columbia, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.