BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Belton, Missouri. Completed plans call for the renovation of a water / sewer project.

The City intends to select a general contractor to procure and install the clarifier mechanism for Clarifier 1 (Figure 1) at the Belton Wastewater Treatment Plant (WWTP). The clarifier mechanism and all appurtenant equipment shall be suitable for installation in the existing 70-foot diameter clarifiers at the Belton Wastewater Treatment Plant as indicated in Appendix A, Scope of Work. Incorporated in Project Special Provisions is a circular clarifier mechanism installation specification that was developed to meet the City's design preferences including controls, materials of construction, and keeping the same suction header type as is currently installed. The specification was reviewed by all acceptable manufacturers listed in Appendix A, Part 2.01. Project questions: All questions regarding the bidding of this project must be submitted to Robert Orr, Engineer I, City of Belton, by phone at (816) 892-1293 or by email at borr@belton.org. All questions must be received (3) days prior to the bid opening. Bid Results : Painted Steel Ross Construction $440,800 Stainless Steel Ross Construction $533,950

Award

Water / Sewer

$974,750.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
29
Bidding Soon
720
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

April 29, 2024

img_map_placeholder

21200 S Mullen Rd, Belton, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.