Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving, outdoor lighting and renovation of a mixed-use development in Red Bluff, California. Working plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for the renovation of a fitness / recreation center.
On April 18, 2023, Red Bluff City Council awarded a contract for Landscape Architect and Engineering Design Services to Melton Design Group. As of March 12, 2024, construction documents are 65% complete. A firm timeline for bid advertisement and construction has not been determined; however, construction is not anticipated to begin prior to 2025. *The previous RFP is listed below for historical purposes. The City of Red Bluff is soliciting qualified firms to submit a full design and engineering services proposal for the Red Bluff River Park Rehabilitation Project . The City is seeking a team that can provide landscape design, architectural services and all engineering services necessary to complete construction drawings and specifications, which may include structural, mechanical, electrical, civil, and/or geotechnical engineering services. A landscape design firm must be the Prime Consultant, who would enter into a contract with the City as the prime contractor, and who may subcontract with other Sub-Consultant firms for a portion of the services, such as architectural design and engineering. The goal of this RFP is to select a design and engineering team that is experienced and qualified to deliver a quality project, proposes a project approach that is innovative and demonstrates an understanding of the project challenges and opportunities, possesses the staff capacity and organization necessary to complete the project as conceived, and offers services at a fair price that results in a high value service to the City of Red Bluff. The City of Red Bluff received a $3 million grant through the Rural Recreation and Tourism Program. The City estimated the Project construction cost in January 2022 at $3,150,000, including $3,000,000 from grant funds and $150,000 from other funding sources for the rehabilitation project. Pre-construction costs, including design and engineering, are estimated at $430,000. Project elements that were prioritized through the community outreach process and included in the Prop. 68 grant application include: New (4) Pickleball courts with shaded seating and lighting; New amphitheater with terraces, band shell and pathways; New spray park with splash pad; (3) new fitness stations; Renovation of (1) existing playground with rubber access and fall material; New restroom/concession/storage facility; New group picnic pavilion with shade structure; Renovate existing pathways for ADA access, landscaping, and native plants; and Renovate existing parking with lighting, ADA access, traffic calming curbs and striping. The method of Contractor Selection has not been Determined at this time.
Final Planning
Playgrounds / Parks / Athletic Fields
$3,150,000.00
Public - City
Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2025
555 Washington St, Red Bluff, CA
Related To This Project
Red Bluff, CA
Bid Date: Mar 28 2023
Red Bluff, CA
Bid Date: Apr 24 2024
Red Bluff, CA
Bid Date: Nov 05 2020
Red Bluff, CA
Bid Date: Apr 26 2023
Red Bluff, CA
Bid Date: May 25 2023
Red Bluff, CA
Bid Date: Jun 02 2023
Red Bluff, CA
Bid Date: Jun 03 2023
Red Bluff, CA
Bid Date: Jun 30 2023
Red Bluff, CA
Bid Date: Feb 09 2023
Red Bluff, CA
Bid Date: Jan 26 2023
Red Bluff, CA
Bid Date: Sep 15 2022
Red Bluff, CA
Bid Date: Sep 15 2022
Red Bluff, CA
Bid Date: Sep 16 2022
Red Bluff, CA
Bid Date: Aug 31 2022
Red Bluff, CA
Bid Date: Jan 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.