Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2025 at 8:00 PM
Updated June 21, 2025
Site work, paving and outdoor lighting for a civil project in Naperville, Illinois. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.
The scope of the project includes a complete roadway reconstruction along with the replacement of the existing sanitary sewers and water main. As part of the roadway reconstruction, these local roads would be brought up to City Standards to include storm sewer, watermain, curb & gutter, and streetlights. QUESTIONS All questions concerning the RFP shall be submitted in writing via email to the Procurement Contact no later than five (5) business days prior to the Closing Date and Time. A written response in the form of an addendum may be issued as appropriate. No contact with any other City employee or Selection Team member shall be made during the RFP process SCOPE OF SERVICES The selected consultant is expected to perform preliminary and detailed design engineering services in accordance with, but not limited to, the overall work tasks outlined in Appendix B. COMPLETION DATE The start of construction is tentatively scheduled for early 2027. Final design plans shall be completed by October 5, 2026. The City of Naperville is soliciting proposals from experienced and qualified consultants to provide preliminary and design engineering services for the proposed improvements of White Oak Drive (~1,000 feet). The project includes a complete roadway reconstruction along with the replacement of the existing sanitary sewers and water main. As part of the roadway reconstruction, these local roads would be brought up to City Standards to include storm sewer, watermain, curb & gutter, and streetlights. Residential driveway access to local traffic must be maintained throughout the duration of the project. The start of construction is tentatively scheduled for March 2026. The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$2,514,569.00
Public - City
Outdoor Lighting, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2026
White Oak Dr, Naperville, IL
Related To This Project
Naperville, IL
Bid Date: Mar 07 2023
Naperville, IL
Bid Date: Nov 03 2025
Naperville, IL
--
Naperville, IL
Bid Date: Mar 01 2024
Naperville, IL
--
Naperville, IL
--
Naperville, IL
Bid Date: Dec 08 2023
Naperville, IL
Bid Date: Mar 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
