BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work, paving and outdoor lighting for a civil project in Naperville, Illinois. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.

The scope of the project includes a complete roadway reconstruction along with the replacement of the existing sanitary sewers and water main. As part of the roadway reconstruction, these local roads would be brought up to City Standards to include storm sewer, watermain, curb & gutter, and streetlights. QUESTIONS All questions concerning the RFP shall be submitted in writing via email to the Procurement Contact no later than five (5) business days prior to the Closing Date and Time. A written response in the form of an addendum may be issued as appropriate. No contact with any other City employee or Selection Team member shall be made during the RFP process SCOPE OF SERVICES The selected consultant is expected to perform preliminary and detailed design engineering services in accordance with, but not limited to, the overall work tasks outlined in Appendix B. COMPLETION DATE The start of construction is tentatively scheduled for early 2027. Final design plans shall be completed by October 5, 2026. The City of Naperville is soliciting proposals from experienced and qualified consultants to provide preliminary and design engineering services for the proposed improvements of White Oak Drive (~1,000 feet). The project includes a complete roadway reconstruction along with the replacement of the existing sanitary sewers and water main. As part of the roadway reconstruction, these local roads would be brought up to City Standards to include storm sewer, watermain, curb & gutter, and streetlights. Residential driveway access to local traffic must be maintained throughout the duration of the project. The start of construction is tentatively scheduled for March 2026. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$2,514,569.00

Public - City

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
239
Bidding Soon
3,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2026

Project location map

White Oak Dr, Naperville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.