BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of an educational facility in College Station, Texas. Completed plans call for the renovation of a educational facility.

A. Work to be done: The work to be performed under this contract and in accordance with these contract documents shall consist of furnishing all necessary plant, labor, materials, and constructing, installing, and performing all work shown and described in the contract documents, all of which are made a part thereof. B. Character of Work and Mechanics: The Work shall be executed in the best and most workmanlike manner by qualified, careful, and efficient mechanics skilled in the trade, and in strict accordance with the contract documents and standards of the industry. Only certified journeymen in respective trades or apprentices under the direct supervision of certified journeymen will be permitted to install, supervise installation of, alter or replace electrical and mechanical systems including but not limited to: pipe, plumbing, HVAC systems, electrical wiring, fire protection systems, welding equipment and devices. A licensed plumber as defined by the Texas Plumbing License Law, section1301.002-#4, A-D., will accomplish installation, alteration and testing of gas systems. A current plumbing, mechanical and electrical license, as indicated in the Supplemental General Conditions, will be recognized as certification upon approval of the Owners Designated Representative. Licenses shall be available at the pre-construction conference and from plumbers, mechanics and electricians at the job site throughout the contract performance. Work accomplished by unlicensed mechanics shall be removed and reinstalled by the contractor using licensed mechanics at no additional cost to the University. Deadline for Questions 5:00 P.M. 02-28-23 Project Description: Install Fume Hood and Safety Shower in room 403 of James J. Cain bldg. # 0391 as per drawings by RSE dated 02/15/2023 Inquiries regarding the submission process/requirements should be directed to SSC Project Manager: Iraj Solouki Email: iraj.solouki@sscserv.com Phone: 979-436-7863 If applicable, inquiries regarding the technical aspects of the Construction Documents shall be directed to: A/E Contact: Tiffany Graebner A/E Firm: Ramirez Simon Engineering LLC Email: tlgraebner@ramirez-simon.com Phone: 832-261-1430 SSC has selected to perform Bid openings via Virtual meetings and/or in person. To facilitate the Virtual bid openings SSC will host all bid openings one (1) hour after the final submission of Historically Underutilized Business (HUB) plans. To enable participants to join the Virtual meeting we are requiring each bidder to add an email address to the outside of your envelopes for HUB plans and CSP documents. This is the email that an invitation will be sent to invite all bidders to join the Virtual meeting.

Post-Bid

Educational

$617,560.00

Public - State/Provincial

Renovation

22

13

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
74
Bidding Soon
2,871
All Active Projects
985
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

April 20, 2023

img_map_placeholder

180 Spence St, College Station, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.