Demolition, site work, paving and new construction of a civil project in Morton, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; bridge / tunnel; and water / sewer project.
As of December 26, 2023, a design team has been selected. Construction timeline has not been identified. Job No. P-99-009-23, Bridge Bundling, Phase I/II Project, Union County, Region Five/District Nine. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 3, 2023, at 10:00 AM at the Region Five/District Nine Office in Carbondale. Phase I and II engineering services are required for a bridge bundling package that includes structure replacements in FY 2026. Phase I shall include field surveys (including route and hydraulic stream surveys), Bridge Condition Report (BCR), hydraulic studies and reports, Traffic Management Analysis (TMA), crash analysis, pedestrian & bicycle accommodation analysis, geometric studies, typical sections, plan & profile, Type, Size and Location (TSL) drawings, cost estimates, pavement design, cross sections, development of construction limits, geotechnical engineering services, SGRs, preparation of environmental documentation for submittal by District, environmental consequences, Bi-Monthly Coordination meeting and exhibits including identification of design exceptions, and other related work necessary to produce Project Reports. Phase II will include the preparation of detailed roadway and structure contract plans. This work may include all associated material: TSL drawings, structure plans, roadway plan and profiles, typical sections, drainage plans, erosion control plans, cross sections, special details, guardrail design, barrier warrant analysis, detour plans, special provisions; quantities, cost estimates, estimate of time, and all other incidental work required to complete the final plans, specifications, and estimates (PS&E documents). The completion date for this contract will be 30 months after authorization to proceed. The Phase I portion is expected to be completed in 18 months and the Phase II portion is expected to be completed in 12 months. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 48 - RFQ Engineering - Bridge Bundling, Phase I/II Project, Union County, Region Five/District Nine
Design
Bridges / Tunnels
$5,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2024
Multiple Locations, Morton, IL
Related To This Project
Morton, IL
Bid Date: Mar 14 2023
Morton, IL
Bid Date: Mar 30 2023
Morton, IL
Bid Date: Apr 05 2023
Morton, IL
Bid Date: Apr 06 2023
Morton, IL
Bid Date: May 05 2023
Morton, IL
Bid Date: Apr 04 2023
Morton, IL
Bid Date: Apr 28 2023
Morton, IL
Bid Date: Apr 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.