Published April 19, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Mount Horeb, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of April 18,2023. project was awarded to Rule Construction, Ltd, awarded amount is $1,342,719.85.** The Village of Mount Horeb reserves the right to reject any and all bids, to waive any technicality, and to accept any bid that it deems advantageous. All bids shall remain subject to acceptance for forty-five (45) days after the time set for bid opening. The Contract award shall be made based on the lowest responsive and responsible Bidder. ESTIMATE OF PRINCIPAL ITEMS Excavation 4,300 CY Concrete Curb & Gutter 3,600 LF Concrete Driveway 940 SF Base Course (12") 5,600 TONS Bituminous Pavement 8,300 SY Water Main 2,160 LF Hydrants 7 EACH Sanitary Sewer Main 1,900 LF Bids from Bidders not on the Plan Holders List may be returned as being not responsive. Each bid must be accompanied by a Bid Bond equal to at least 10% of the maximum bid as a guarantee that if the bid is accepted, the Contractor will, within 10 days of receipt of the Notice of Award, furnish the Owner with a Performance and Payment Bond equal to the Contract price. Time of Completion. All work shall be completed and ready for final acceptance by August 26, 2023. All work shall be completed within 75 calendar days from the time that construction commences

Award

Roads / Highways

$1,342,720.00

Public - City

Paving, Site Work

29

17

16

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 11 - Equipment

Division 11 - Equipment

Other Equipment, Horticultural Equipment, Seeders
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
63
Bidding Soon
919
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Mount Horeb, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.