Renovation of a municipal facility in Woonsocket, Rhode Island. Completed plans call for the renovation of a municipal facility.

Question Deadline 03/01/2023 at 11:00 AM ET Carroll Daniel Construction Company (CDCC or Construction Manager or CM) invites qualified bidders to submit lump sum bids for bid packages associated with the Hall County School District Farm Meat Processing Facility project located at 4439 Cleveland Highway, Gainesville, Georgia 30506. The scope of this project includes a new one-story educational meat processing facility and associated sitework. Bids must be submitted on the Construction Managers Proposal Form along with Bid Bond if required. Bids must be submitted per the requirements of the Instructions to Bidders, Requirements for All Bid Packages, and the appropriate Bid Package Scope of Work. Email your bid to the email address designated below for receipt of bids. Bids received after the time is called will not be accepted. Bidders may also submit fax (770-534-3799). Faxes need to be clearly addressed for the project proposed and must be received. Emailed bids should be sent to bids@carrolldaniel.com and must have the word Bid and the Project Name in the subject. All emailed or faxed quotes must be received prior to 3:00 PM. BIDS WILL NOT BE ACCEPTED. No determination will be made as to the most responsive bidder until a thorough evaluation has been conducted by the Construction Manager and the Owner. Additional information may be requested of responsive bidders and may be used to help select the most qualified bidder. The Construction Manager and Owner reserve the right to accept or reject any or all bids and to waive technicalities. Davis-Bacon Act Compliance THIS PROJECT REQUIRES DAVIS-BACON ACT WAGES. SEE EXHIBIT 1 TO INVITATION TO BID. Bid Packages The following Bid Packages are available for bidding. Coordinate with Instructions to Bidders. BP02A Earthwork, Utilities, & Paving BP02B Fences & Gates BP02C Landscaping BP03 Turnkey Concrete BP04 Turnkey Masonry BP06 Rough Carpentry BP07D Insulated Wall & Ceiling Panels BP07E Metal Roofing BP07J Spray Foam Insulation BP08A Doors, Frames, & Hardware - Material BP08B Doors & Hardware - Install BP08C Overhead & Coiling Doors BP08D Glass & Glazing BP09A Gypsum Board Assemblies BP09B Resilient Flooring BP09G Resinous Flooring BP09I Paints & Coatings BP10A Specialties BP10C Signage BP10D Metal Lockers & Benches BP15A HVAC & Controls BP15B Plumbing BP15C Fire Protection BP16 Electrical & Low Voltage List of Bidding Documents o Invitation to Bid (2 pages). o Instructions to Bidders titled "HALL COUNTY SCHOOL DISTRICT FARM MEAT PROCESSING FACILITY" prepared by the Construction Manager. o Bid Proposal Forms for each bid package titled "HALL COUNTY SCHOOL DISTRICT FARM MEAT PROCESSING FACILITY" prepared by the Construction Manager. o Scope of Work Bid Packages, as listed above, prepared by the Construction Manager. o Plans titled "HCSD FARM - MEAT PROCESSING FACILITY" prepared by Hussey Gay Bell. o Specifications titled "MEAT PROCESSING FACILITY HALL COUNTY SCHOOL DISTRICT FARM" prepared by Hussey Gay Bell. o Report of Subsurface Exploration, Hall County Schools Teaching Farm, 4439 Cleveland Highway, Hall County, Georgia, SGC Project No. 13600G, Report No. 97488, dated Nov. 10, 2022, by Southern Geotechnical Consultants. o All addenda and clarifications issued prior to the date and time set for opening of bids. Bidders are encouraged to prequalify as a subcontractor of Carroll Daniel Construction Company, as this is a requirement prior to any subcontract award for many of our projects. This process is initiated by submitting company profile information to: portal. A subsequent prequalification link will be generated to complete the prequalification request. If you have an existing portal profile, you may request prequalification access by emailing your request to rrogers@carrolldaniel.com. Prequalification will be considered in subcontractor selection and a condition of contract. It is also understood that with submission of bid, the bidder has inspected the site. Substantial Completion date is 365 calendar days after receipt of a Notice to Proceed. Final Completion date is 30 calendar days after the Substantial Completion date

Post-Bid

Municipal

Public - State/Provincial

Renovation

12

14

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
250
Bidding Soon
3,134
All Active Projects
1,408
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

img_map_placeholder

Multiple Locations, Woonsocket, RI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.