BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Scope of Work of the Contract includes the construction of the additional lanes to complete the boulevard section of Cane Island Parkway from Franz Road to Swift Way. The total roadway length is approximately 4,400 linear feet. The project involves completing the boulevard section by constructing the other two travel lanes, associated turn lanes, median cuts and installation of drainage inlets. The project also includes the installation of a new traffic signal at the Cane Island Parkway and Franz Road intersection, additional curbs ramps and crosswalks, as well as constructing the westbound travel lanes on Franz Road. The deadline to ask questions is 3/03/2023 5:00 PM CST

Bid Results

Roads / Highways

$1,770,000.00

Public - City

Paving, Site Work

71

16

16

5

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
237
Bidding Soon
3,798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.