BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in El Dorado, Arkansas. Working plans call for the renovation of a municipal facility.

For a new membrane roofing system at the Atrium and restoration of exterior limestone column bearing shelves at the Union County Courthouse, El Dorado, Arkansas. A certified Bid Tabulation will be produced and distributed as quickly as is practical following the bid opening. A five percent (5%) corporate Bid Bond or a certified check in the amount of five percent (5%) of the bid shall accompany all submitted bids on construction contracts that exceed $20,000.00 in accordance with ACA 22-9-203. Bidders must comply with all requirements of Contractors Licensing Laws of the State of Arkansas, Act 150 of 1965, as amended, and Arkansas Code 22-9-204 section 3.6(a). A Performance and Payment Bond, equal to the amount of the contract, and issued by a surety approved by the Owner and authorized to do business in the State of Arkansas will be required of the successful bidder. Pursuant to Ark. Code Ann. 22-9-203, the Owner encourages all small, minority, and women business enterprises to submit bids for capital improvements. Encouragement is also made to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. The Owner reserves the right to reject any or all bids and to waive formalities. Proposals which fail to comply fully with any provision of the Plans, Specifications and other Contract Documents will be considered invalid and will not receive consideration. Contract Documents may be examined at the Office of the Architect. Questions regarding drawings and specifications should be addressed to the Architect. a. Remove and replace existing TPO membrane roofing system at Atrium roof. b. Clean horizontal surfaces ofrecessed column bearing shelf and its vertical outside edges at all facades of existing building. c. Remove mortar from all joints in horizontal surfaces ofrecessed column bearing shelf and its vertical outside edges at all facades of existing building. d. Repoint all joints in horizontal surfaces of recessed column bearing shelf and its vertical outside edges at all facades of existing building.

Final Planning

Municipal

$145,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
7
Bidding Soon
154
All Active Projects
85
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

October 6, 2023

img_map_placeholder

101 N Washington Ave, El Dorado, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.