BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Fontana, California. Completed plans call for site work for a playground / park / athletic field.

DESCRIPTION - The City of Fontana ("City") seeks to engage the services of a qualified firm to design, fabricate and install fabric shade structures to cover the spectator bleachers areas at Bill Martin Park, Jack Bulik Park, and Veterans Park. Fontana Park, Heritage Circle Park, Miller Park, Southridge Park will require shade structure over the existing Playground areas. The City of Fontana ("City") seeks to engage the services of a qualified firm to design, fabricate and install several fabric shades structures to cover spectator bleachers areas and over existing Playgrounds at several City Parks. Bill Martin Park, 7881 Juniper Ave. Fontana, CA 92336. Fontana Park, 15556 Summit Ave, Fontana, CA 92336. Jack Bulik Park, 16581 Filbert Aver., Fontana, CA 92335. Heritage Circle Park, 14332 Caryn Cir. Fontana, CA 92336. Lemon Pepper Park, 7930 Lemon Pepper Ave. Fontana, CA 92336. Miller Park, 17004 Arrow Blvd, Fontana, CA 92335. Southridge Park, 14501 Live Oak Ave. Fontana, CA 92337. Veterans Park located at 17255 Merrill Ave., Fontana, CA 92336. FEDERAL FUNDING REQUIREMENTS Funds from the Coronavirus State Fiscal Recovery Fund and/or the Coronavirus Local Fiscal Recovery Fund, together known as the Coronavirus State and Local Fiscal Recovery Funds ("CSLFRF") program, will be used to fund all or a portion of this Project. The successful bidder will be required to comply with all requirements associated with federal funding in carrying out the Project. The Federal Contract Provisions provide additional information on federal funding requirements. License Requirements "A" or "B" contractor's license sufficient to perform the work ENGINEER'S ESTIMATE: Bill Martin Park (10 canopies): $400,000.00 Fontana Park (1 canopy): $100,000.00 Jack Bulik Park (14 canopies): $600,000.00 Heritage Circle Park (1 canopy): $100,000.00 Lemon Pepper Park (1 canopy): $65,000.00 Miller Park (1 Canopy): $90,000.00 Southridge Park (1 Canopy): $100,000.00 Veterans Park (12 Canopy): $480,000.00 ME OF COMPLETION: 120 Working Days (All canopies included in this time frame) Type of Award Lump Sum Online Q&A Online Q&A Yes Q&A Deadline Q&A Deadline March 9, 2023 2:00 PM (PST) Response Format Electronic Project Type Bid Type of Award Lump Sum Pre-Bid Meeting No 1. Provide all pre-construction design and engineer drawings in order to obtain necessary permits. 2. Provide all layout and survey work for the entire project 3. Provide all necessary testing of existing underground soil conditions. 4. Provide layout for all posts which must be installed on engineered foundations. 5. Provide all removal and relocation of necessary bleachers, concrete, trash cans, any other items to accommodate proposed design. 6. Provide protection, temporary 6-foot chain-link fence and maintain the construction area 7. Contractor is responsible for all safety measures for the site from the time the Notice to Proceed is issued until the City accepts the finished project in writing. 8. Contractor is responsible for cleaning the site each day to remove debris and items that may be safety hazards and keep the site tidy.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,510,980.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
102
Bidding Soon
2,219
All Active Projects
997
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

May 15, 2023

img_map_placeholder

Multiple Locations, Fontana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.