This is a service / maintenance or supply contract in Lyon Township, Michigan. Contact the soliciting agency for additional information.

Removal of all trees and brush, stumps and debris within a 66' wide x 2,640' road rightof-way Pere Cheney Road; from Bell Top Lodge Road, west to Stephan Bridge Road, located on the !4 section line in section 8, T25N, R2W South Branch Township, Crawford County, Michigan Removal of all trees and brush, stumps, and debris within a 66' wide x 2,640' road rightof-way Pere Cheney Road; from Stephan Bridge Road, west 2,640 feet, located on the 14 section line in section 7, T25N, R2W South Branch Township, Crawford County, Michigan. Project Completion Date: May 26, 2023, unless a different date is authorized by the Crawford County Road Commission. Contractor shall provide Certificate ofInsurance prior to commencing work. Certificate shall include: 1) Board ofCounty Road Commissioners AND the Crawford County Road Commission named as additional insured to all coverage, 2) Bodily Injury Liability - each person - $500,000.00 each occurrence, 3) Bodily Injury Liability - each accident - $1,000,000.00, 4) Property Damage Liability - each accident - $1,000,000.00, 5). Single Limit Policy - $1,000,000.00 and 6) Worker's compensation- statutory limits The Board reserves the right to reject any or all bids, to waive informalities in the bids and to award the bid deemed to be in the best interest of Crawford County #1. Removal of all trees and brush, stumps and debris within a 66' wide x 2,640' road right-of-way Pere Cheney Road; from Bell Top Lodge Road, west to Stephan Bridge Road, located on the 14 section line in section 8, T25N, R2W South Branch Township, Crawford County, Michigan. #2 Removal of all trees and brush, stumps and debris within a 66' wide x 2,640' road right-of-way Pere Cheney Road; from Stephan Bridge Road, west 2,640 feet, located on the 14 section line in section 7, T25N, R2W South Branch Township, Crawford County, Michigan Bidder shall indicate total Lump Sum payment for each segment. Project limits shall be provided by the Crawford County Road Commission and shall indicate same by staking and additional side markings with orange ribbon and or paint. An on-site conference between the contractor and the Crawford County Road Commission is required before work begins. Except in areas to be excavated, stump holes and other holes from which, obstructions are removed shall be backfilled with suitable material. All work is confined within the 66-foot-wide right of way. Do not cut the marked boundary lines trees. Use ofPrivate Property shall not be permitted unless by written permission by the Landowner. A copy ofwritten permission shall be provided to the Crawford County Road Commission office prior to work. Contractor is required to have written permission from landowner to place any fill, trees, stumps, or debris on private property. A copy ofthe permission slip shall be provided to the Road Commission office prior to work. Dozer rake required on this project. Contractors to remove all debris from Road R.O.W. including trees, brush, stumps. Care should be taken to preserve any property surveys or concrete monuments. Ifrequested by an adjacent landowner, all firewood shall be left outside ofthe right-ofway. This wood shall be cut into lengths no less than eight feet, having a diameter of at least six inches. Work is for the removal of all trees and brush, stumps, and debris, located within the project limits Burning of perishable material shall be done in accordance with applicable laws, ordinances, rules, and regulations. All necessary permit approvals shall be obtained prior to burning. Unless burned in accordance with the requirements herein, perishable materials and debris shall be removed from the right-of-way and disposed ofin accordance to local regulations. Traveled portion ofthe roadway shall be restored to its original condition or better at the end of each day's work. Contractor shall not be allowed to shut down segments ofthe roadway when working. Roadway must be opened to traffic at the end of each day's work. Contractor shall provide the Road Commission with a traffic control plan prior to commencement of work Traffic Control Devices and flagmen shall be the responsibility ofthe Contractor. Traffic shall always be maintained unless otherwise agreed upon. Removal of all trees and brush, stumps, and debris within a 66' wide x 2,640' Total Bid, segment #1: $ #2 Total Bid, segment #2: $ Company Name: Address: Signature: Date: Completion Date: #1. road Removal of all trees and brush, stumps, and debris within a 66' wide x 2,640' road right-of-way Pere Cheney Road; from Stephan Bridge Road, west 2,640 feet, located on the % section line in section 7, T25N, R2W South Branch Township, Crawford County, Michigan. right-of-way Pere Cheney Road; from Bell Top Lodge Road, west to Stephan Bridge Road, located on the 14 section line in section 8, T25N, R2W South Branch Township, Crawford County, Michigan.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
55
Bidding Soon
648
All Active Projects
223
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 16, 2023

April 17, 2023

May 26, 2023

img_map_placeholder

E Pere Cheney Rd, Lyon Township, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.