Site work for a water / sewer project in Citrus Heights, California. Completed plans call for site work for a water / sewer project.

The project is generally described as water distribution system repairs, rehabilitation, replacement, and new infrastructure to improve City of Folsom water system deficiencies. An existing water transmission line shall be rehabilitated along Folsom Auburn Boulevard and Greenback Lane to provide emergency water supply to the City. Addition provisions for bypassing and isolation of the water system and SCADA monitoring of an existing PRV shall also be provided. Contractor's License Requirement: Class A-General Engineering Contractor. Each bid must be accompanied by security consisting only of cash, California Bank Cashier Check, Certified Check, California Bank Money Order, or bid bond made payable to the City of Folsom in the sum of ten percent (10%) of the sum of the proposal. It is understood that this bid is based upon completion of the work to within a period of 330 calendar days commencing on the day the Notice to Proceed is issued. The amount of the liquidated damages to be paid by the Contractor for failure to complete the entire work by the Completion Date (as extended, if applicable) will be $1,500 for each calendar day, continuing to the time at which the work is completed. Such amount is the actual cash value agreed upon as the loss to the City resulting from Contractor's default. The City, through the Architect or Consulting Engineer, will normally respond to the RFI within fifteen (15) Working Days. The response will be in writing, and that response shall control. The Contractor shall indicate a priority for responses to RFI's if more than five (5) RFI's are pending at the same time. The right to reject any and all bids, or waive any informality in any bid received is reserved by the City Council. Requests for technical information or clarification shall be directed to the City's representative, Nathan Stites, via email at nstites@folsom.ca.us on or before Friday, March 10, 2023 at 4:00 P.M. he work to be done consists of furnishing all labor, materials, equipment, and services for the Ashland Water Rehabilitation Project I, including traffic control, CCTV and access for CCTV, water main piping repair and removal and replacement, valve removal and installation, water main tie-ins including connections to the existing water main, including all trenching and backfilling; all piping; disinfection and flushing of the entire system, all paving and rehabilitation of surface features, all site work and grading and traffic control; add electrical and instrumentation work to provide SCADA to an existing PRV station, replace PRV and PRV enclosure, and all miscellaneous work as shown, specified or required for a complete, operational installation. A. The Contractor shall furnish all labor, superintendence, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services, and other means of construction necessary or proper for performing and completing the work. B. The Contractor shall obtain and pay for all required permits. C. Contractor shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property, to the satisfaction of the Owner's Representative and in strict accordance with the Contract Documents. D. The Contractor shall clean up the work site and maintain it during and after construction, until accepted, and shall do all of the work and pay all costs incidental thereto. E. The Contractor shall repair all structures, pavement, and property, in kind, that may be damaged or disturbed during performance of the work. F. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary to perform in a satisfactory and acceptable manner all the work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his equipment.

Award

Water / Sewer

$2,351,019.00

Public - City

Site Work

36

18

12

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
80
Bidding Soon
1,393
All Active Projects
586
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2023

June 7, 2023

img_map_placeholder

Multiple Locations, Citrus Heights, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.