Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in New Ulm, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Bid Results. General Contractor Minnesota Paving & Materials $338,500.90 General Contractor Central Specialties Inc $352,757.30 General Contractor Duininck, Inc $334,534.80 General Contractor KNIFE RIVER $323,913.15 For CSAH 20 CIR and Overlay Between CSAH 8 and TH 4 Major quantities include: 1,388 L.F. Remove Guardrail; 22,975 Tons Aggregate Shoulder Class 1; 10,920 S.Y. Mill Bituminous Surface; 69,870 S.Y. Full Depth Reclamation; 154,170 L.F. Mill Rumble Strips; 211,790 S.Y. Cold Inplace Recycle; 1,283 Tons Bituminous Material For Mixture CIR-EE; 30,060 Gal. Bituminous Material for Tack Coat; 59,010 Tons Wearing Course Mixture; 1,500 Tons Bituminous Mix Production; 915 S.F. Concrete Sidewalk; 138 L.F. Concrete C&G Design B618; 1,388 L.F. 3-Cable Guardrail; 8 Each Anchorage Assembly-Cable; 6 L.S. Traffic Control; 258,500 L.F. 4 Inch Striping and 144 L.F. 24 Inch Solid Line Preform Tape Ground In - White A bidder's bond or a certified check payable to the Treasurer of Brown County in the amount of at least 5% of the total amount bid must be included. A check, draft or money order in the amount listed above, and payable to the Brown County Treasurer must accompany requests for plans and proposal.
Award
Roads / Highways
$6,037,015.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 22, 2023
June 5, 2023
CSAH 20, New Ulm, MN
Related To This Project
New Ulm, MN
Bid Date: Mar 22 2023
New Ulm, MN
Bid Date: Mar 22 2023
New Ulm, MN
Bid Date: Mar 22 2023
New Ulm, MN
Bid Date: Apr 05 2023
New Ulm, MN
Bid Date: Mar 16 2023
New Ulm, MN
Bid Date: May 04 2023
New Ulm, MN
Bid Date: Jun 21 2023
New Ulm, MN
Bid Date: Jun 21 2023
New Ulm, MN
Bid Date: Mar 22 2023
New Ulm, MN
Bid Date: Mar 15 2023
New Ulm, MN
Bid Date: Mar 15 2023
New Ulm, MN
Bid Date: Feb 14 2023
New Ulm, MN
Bid Date: Jul 20 2021
New Ulm, MN
Bid Date: Apr 13 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.