BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a warehouse / distribution facility in Highland Park, Illinois. Completed plans call for the demolition of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

Demolitions, General Contractors-Buildings Public/Commercial, Qualification, Quotes, Facilities , Miscellaneous, Structural, General Contractors - Construction Demolition of the existing Public Services Salt Dome located at 1180 Half Day Rd., Highland Park, Illinois. 1. The Contractor is responsible for contacting JULIE and the City for service locations prior to demolition. 2. The Contractor will be responsible for the coordination and disconnecting of the existing electric service. When this has been completed, notification is to be given to the City. 3. Removal and disposal of all soft and hard surfaces including but not limited to concrete walls, wood structure walls and roof and all other associated items related to the structure. 4. Removal and disposal of one 82 ft. in diameter reinforced concrete structure including walls and roof. Voids in pavement shall be backfilled with granular stone, furnished by the Contractor and mechanically compacted at one foot (1') in depth intervals. 5. The Contractor is responsible for erosion control and fencing and barricades around the site during demolition, and they will remain until a final permit inspection has been completed and approved. 6. The Contractor will be responsible for all demolition permits required for the demolition work. Work will not begin until all permits have been received and approved by the OWNER. 7. The Contractor is responsible for damage any surrounding structures and area caused by their means and methods of demolition. 8. During the demolition process, the demolition contractor is responsible for keeping the debris from surrounding roads during hauling. Street sweeping will be required, if necessary. The Contractor shall be responsible for dust control due to their activity. 9. The Contractor shall be responsible for the repair of any street, pavement, gravel, sidewalks and grass turf damaged, due to their construction activity. 10. During the demolition process, the hours of operation shall be between 7:00 a.m. to 3:00 p.m. per City ordinance are 7:00 a.m. to 8:00 p.m., Monday through Friday

Award

Warehouse / Distribution

$45,389.00

Public - City

Demolition, Site Work

3

4

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
128
Bidding Soon
1,968
All Active Projects
844
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

April 3, 2023

img_map_placeholder

1180 Half Day Rd, Highland Park, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.