BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Columbia, South Carolina. Completed plans call for the renovation of a medical facility.

EHRM Infrastructure Upgrades Construction at the Columbia VA Health Care System The primary scope is to replace the entire primary voice/data system throughout the hospital including renovation of main Data Center and adding telecom rooms as shown in the bid documents. Includes electrical upgrades as well as mechanical upgrades (some plumbing as required for rework), add to existing BMS, security work, etc. Architectural work includes: demolition, asbestos abatement, drywall/framing, flooring, etc... Sitework is a very large duct bank which will include patching back walkways, curb, paving, landscaping, etc. All the work will be phased. Phasing plan for the main Data Center (Basement) is on sheet A-100.0C. Plan for night work (VA operating hours are M-F, 7am to 5 pm). We have to coordinate any work outside of normal business hours. There are wage determination requirements. Project IS NOT tax exempt, please include all applicable sales & use tax. P&P Bonds will be required for mechanical, electrical, plumbing, fire protection, LV (security, data, etc) and site work (duct bank). In accordance with 38 U.S.C. 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM Infrastructure Upgrades construction project, in accordance with the attached Specifications and Drawings. This project is located at the: Columbia VA Health Care System 6439 Garners Ferry Road Columbia, SC 29209 VAAR Magnitude of Construction: $20,000,000 to $50,000,000 Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Kelly Han. Questions shall be submitted only via e-mail to: kelly.han@va.gov and maria.rodeffer@va.gov . The subject line must read: Columbia VAMC EHRM Infrastructure - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS Friday, July 28, 2023 at 1:00 PM ET. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Medical

$45,927,000.00

Public - Federal

Renovation

491

29

6

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
48
Bidding Soon
730
All Active Projects
343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

July 1, 2024

img_map_placeholder

6439 Garners Ferry Rd, Columbia, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.