Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 23, 2023 at 8:00 PM
Updated January 26, 2024
Site work and new construction of a municipal facility in Iqaluit, Nunavut. Completed plans call for the construction of a 43,556-square-foot, two-story above grade municipal facility; and for site work for a municipal facility.
Work under this contract consists of but not necessarily limited to the construction of Nunavut Recovery Centre in Iqaluit, as part of the overall Addictions and Trauma Treatment Plan for Nunavut. The centre will be approximately 4033m2, to be located across the street from Artic Winter Games Arena (AWG) down Bonfire Road and as noted in drawings and specifications. Documents can be obtained from http://www.nunavuttenders.ca
Award
Municipal
$67,513,533.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
33
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 6, 2023
July 3, 2023
Lot 1, Block 247, Bonfire Road, Iqaluit, NU
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
