BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a water / sewer project in Deercreek Township, Ohio. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of March 25, 2024, a construction manager@risk has been selected and this project is in the pre/construction/negotiated status. Preliminary design is in progress. It is anticipated sub-bidding will commence in August 2025. A firm timeline for start of construction has not been determined. The new site location that is currently under consideration, is near the Interstate 70/U.S. 42 interchange in the Deer Creek. In accordance with Section 9.33, et seq., of the Ohio Revised Code, the Madison County Board of Commissioners (Owner) will receive Statements of Qualifications (SOQs) for Construction Manager at Risk (CMAR) services associated with the Mid-Ohio Wastewater Treatment Plant Project as more fully described in the Request for Qualifications (RFQ). *The closed solicitation has been included below for reference: Communication with the Engineer: Respondents should direct all questions in writing as follows. o Mike Flickinger, P.E., Design Manager o Phone: (614) 825-6720 o E-mail: Mike.Flickinger@jacobs.com o Questions submitted to the Engineer later than 7 days prior to the SOQ submittal date will not be accepted. The Owner reserves the right to accept or reject all or portions of any response(s) to the RFQ, to waive any formalities of the RFQ process, to re-advertise the RFQ, to amend the terms of the RFQ, to extend the dates provided herein, to suspend the procurement if the desired outcomes are not achieved, and/or proceed to provide the services otherwise, as the Owner may determine in its sole discretion is in the best interest of the Owner Summary of Work: The Project is currently in the preliminary design phase and is intended to provide a new 4 million gallon per day (mgd) facility that can be expanded to 12 mgd. The treatment facilities currently being considered include influent pumping, preliminary treatment, secondary treatment including activated sludge processes and secondary clarifiers, disinfection, post aeration, plant outfall, sludge thickening, aerobic digestion, and sludge dewatering. Additional facilities and support structures being considered include septage receiving facilities; operations building which includes publicly-accessible areas for the Owner's business operations in addition to privately-accessible areas for the Owner's treatment operations including multiple laboratory spaces; support structures housing pumps, blowers, electrical distribution, and other equipment; and a biosolids facility for regional biosolids handling and storage Project Schedule: Pre-construction CMAR services are anticipated to begin June 2023. On-site construction is anticipated to begin April 2024. Treatment upgrades are to be operational by April 2026. The overall construction duration is anticipated to be 24 months. Project Location: Adjacent to US 42 to I-70 WB entrance ramp | Deer creek Township. See Attachment 1 for general location. Project location is subject to change.

Pre-Construction/Negotiated

Water / Sewer

$55,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
67
Bidding Soon
1,070
All Active Projects
433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

October 1, 2025

img_map_placeholder

To Be Determined, Deercreek Township, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.