Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a golf course in McKinney, Texas. Completed plans call for site work for a golf course.
No answers provided during the visit will be considered official as all official responses to all questions shall be provided via written addenda. Question Deadline 03/09/2023 at 2:00 PM CT All questions regarding the meaning or intent of these documents shall be via the questions tab in the eBid system Bid Openings: One tap mobile +13462487799,,85317598446# US (Houston) +17193594580,,85317598446# US Dial by your location +1 346 248 7799 US (Houston) +1 719 359 4580 US +1 253 205 0468 US +1 253 215 8782 US (Tacoma) +1 669 444 9171 US +1 669 900 9128 US (San Jose) +1 646 558 8656 US (New York) +1 646 931 3860 US +1 689 278 1000 US +1 301 715 8592 US (Washington DC) +1 305 224 1968 US +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 360 209 5623 US +1 386 347 5053 US +1 507 473 4847 US +1 564 217 2000 US 877 853 5257 US Toll-free 888 475 4499 US Toll-free 833 548 0276 US Toll-free 833 548 0282 US Toll-free Meeting ID: 853 1759 8446 Find your local number: https://us02web.zoom.us/u/kdKTcrw1Rz Oak Hollow Golf Course is an 18 hole par 70 Championship Golf Course on approximately 100 acres of land. Current conditions of the course; the current putting greens, tee boxes and collars are Tif-dwarf Bermuda grass installed in 1997. It is the City's goal to begin this project at the beginning of June 2023 and have the entire project completed before the end of August 2023.The golf course shall be closed for the duration of this project with the exception of the driving range and two practice putting greens, notated as #2 and #3 in Attachment B - Oak Hollow Greens. The awarded Contractor shall be required to perform the following and shall include all costs for these services in their proposal pricing. o Provide administration and construction support services to complete the work including construction staking and surveying. o Apply for and procure all applicable permits from the applicable governing agencies. This project falls within the City of McKinney, Collin County, Texas. o Procure necessary permits for personnel, equipment, and construction operations. o Coordinate and schedule work provided by others. o Provide a list of all vendors and/or subcontractors who will be on the job. o Video record existing site conditions. o Establish traffic control on or near project site. o Establish temporary utilities (water); Note - Contractor is responsible for paying for water. o Repair of any damage to existing irrigation system. o Provide grading repair and grassing to all areas damaged by construction operations.o Clean-up. o Punch list to Substantial Completion. o Final walk-through. o Punch list and close-out to Final Acceptance. o Coordination with local municipality and other governing agencies as required. o Coordination with other contractors as required. o All work shall be completed between 6:00 AM and 9:00 PM CT. All change requests shall be made in writing to the City point of contact. o Putting Green Surfaces: o Treat 20 putting green surfaces with Broad Spectrum Herbicide before removal. o Remove existing putting green turf-grass. All removed material shall be tilled into the tee boxes to create new soil base. o Install new turf-grass green surfaces on 20 putting green surfaces. This includes 18 on-course greens, chipping green and nursery green (approx. 117,000 sq ft). o Turf-grass on putting greens shall be an Ultra Dwarf Bermuda Grass species capable of being properly maintained at 1/8" inch or less. o Shaping of new putting surface should match USGA Recommendations. See Attachment A. o Collar Surfaces: o Remove collar surfaces and install new turf-grass of 20 putting greens (approx. 25,000 Sq ft). o Turf-grass on collars of putting green shall be a suitable Bermuda grass species capable of being properly maintained at 1/2" inches. o Tee Boxes: o Removal of 56 existing tee box grass (approx. 95,000 sq ft) and installation of new expanded tee boxes with grass (approx. 124,000 sq ft after expansion of all tee boxes). o Turf-grass on tee boxes shall be a Hybrid Bermuda Grass species capable of being properly maintained at 1/2" inches. o After removed materials from putting greens is tilled into the tee boxes to create a new soil base Hybrid Bermuda Grass shall be sprigged into new soil base to create new tee boxes
Award
Golf Course
$596,270.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 16, 2023
June 1, 2023
3005 N McDonald St, McKinney, TX
Related To This Project
McKinney, TX
Bid Date: Feb 16 2024
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
McKinney, TX
Bid Date: Feb 22 2023
McKinney, TX
Bid Date: Feb 17 2023
McKinney, TX
--
McKinney, TX
--
McKinney, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.