BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition and site work for a residential development in Celina, Texas. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Demolition of three properties within the City Limits. Questions Due : 3/2/2023 12:00:00 PM (CT) 1 st LOCATION: 308 N. Ohio Celina, TX 75009 *Contact Sharelyn Drummonds for directions, 469-217-9497 All debris resulting from demolition / cleanup operations shall be removed as it accumulates and shall not be allowed to be stored on site. o Debris shall not be burned on the site. o Demolition / clean up shall be conducted in a safe and workmanlike manner in accordance with all Federal, State, and local Laws. o All surplus materials removed shall become the property of the contractor and shall be removed from the premises unless otherwise agreed. o Entire lot shall be left in a mowable condition and have positive drainage that does not create pooling water. Additional dirt may be required to ensure positive drainage after foundations are removed. DISMANTLING OF ABOVE-GRADE STRUCTURES Dismantle main building with all parts removed from the site and disposed of, including timbers, concrete slabs, service walks & driveways, and footings. REMOVAL OF FOOTINGS AND FOUNDATIONS All footings, foundations, piers, grade beams and slabs shall be completely removed. Fill dirt is required to prevent pooling of water. Site shall be left with a positive drainage condition. EARTH-MOVING AND FILLING OF EXCAVATIONS Fill any excavations to the natural grade, spread or remove unnatural hills or mounds of earth. REMOVAL OF FENCING AND METAL POSTS All fencing, including posts and supports, shall be removed. REMOVAL OF TRASH / DEBRIS All trash, debris, rubbish and household items shall be removed. REMOVAL OF ACCESSORY STRUCTURES All accessory buildings / structures and their foundations shall be removed. REMOVAL OF LANDSCAPING All stone, pavers, timbers, and dead landscaping shall be removed TIMELINE All work must be completed by March 30th, 2023. 2 nd LOCATION: 210 S Tennessee Celina, TX 75009 *Contact Sharelyn Drummonds for directions, 469-217-9497. All work must be completed within 30 days from the date the purchase order is issued. 3 rd LOCATION: 208 S Tennessee Celina, TX 75009 *Contact Sharelyn Drummonds for directions, 469-217-9497 All work must be completed within 30 days from the date the purchase order is issued.

Award

Residential Subdivision

$20,850.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
66
Bidding Soon
3,516
All Active Projects
1,398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.