BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2023 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Pittsburgh, Pennsylvania. Contact the soliciting agency for additional information.

For Davis Avenue Bridge CM/CI The City of Pittsburgh's Department of Mobility and Infrastructure is seeking responses for a scope of work pertaining to the Construction Management and Inspection for the reconstruction of the Davis Avenue Bridge over Woods Run Road in the Brighton Heights neighborhood. The new bridge is to be a 3-span pedestrian/bicycle bridge into Riverview Park. Anticipated Notice to Proceed is May 10th, 2023. Project completion is estimated for December 27th, 2023. Question Submission Deadline:March 17, 2023, 3:00pm Contract Award:March 2023 The City of Pittsburgh shall not be responsible for proposals delivered to a person or location other than that specified herein. All submittals, whether selected or rejected, shall become the property of the City of Pittsburgh and will not be returned. All costs associated with proposal preparation shall be borne by the applicant. The City of Pittsburgh is committed to the ideal of providing all citizens an equal opportunity to participate in City and its Authorities' contracting opportunities. It is therefore the City's goal to encourage increased participation of women and minority groups in all City contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of Minority-Owned Business Enterprises (MBE's) and Women-Owned Business Enterprises (WBE's) in work to be performed under City contracts. The levels of MBE and WBE participation will be monitored by the City of Pittsburghs Equal Opportunity Review Commission (EORC). In order to ensure that there are opportunities for historically disadvantaged minority groups and women to participate on Covered Contracts, and consistent with the City's current equal employment opportunity practice and goals, the EORC will review contracts to include an evaluation of a developer/contractors employment of minority groups and women, encourage goals of eighteen (18) percent and seven (7) percent respectively. After the City has received all Proposals and conducted its initial Evaluation, described above, the Proposal Committee may invite one or more Respondents to a follow-up interview to further discuss their Proposal(s). The Proposal Committee may decide to accept the Proposal of one or more Respondents. It may decide to reject all proposals. Once a Proposal is accepted, the contract negotiation process will commence. This ITQB and your response to it, in the form of your entire Proposal, will become part of the Contract. If a real or apparent conflict should arise between this ITQB/Proposal and other language contained in the final Contract, the language of the final Contract shall control. The method of contractor selection has not been determined at this time

Conceptual

Bridges / Tunnels

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
85
Bidding Soon
1,706
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

Project location map

Davis Ave, Pittsburgh, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.