BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Wauwatosa, Wisconsin. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of October 30, 2024, this project has been awarded but construction will not begin until spring 2025. Engineering & Architectural Design Services for West Zone Pumping Station The City of Wauwatosa, Wisconsin is soliciting proposals from qualified engineering firms for the design of a water pumping station. The City of Wauwatosa's water utility provides services to two (2) separate pressure districts, east and west. West pressure district is approximately 20psi higher than the east pressure district. The eastern district utilizes three pumping stations and two elevated towers, while the western district only has one station and one tower available at a time. The lack of a secondary pumping station makes the western district extremely vulnerable to system wide failures if the water feeding the pumping station or the pumping station itself experiences a failure. If a system wide failure were to occur and pressure within the system was reduced the lack of pressure would result in potential contamination to the drinking water supply as well severely limit the ability to provide water to combat fires. In order to protect the western pressure district's water customers a secondary pumping station is needed in order to backup to the existing primary station and feed. The proposed secondary pumping station will be located adjacent to the Burleigh Water Tower (11501 W. Burleigh Street). The pumping station will be sized in order to service the entire western district so that if a failure occurs at the primary station no loss of service would occur, all in accordance with the City of Wauwatosa Request for Proposal dated February 20, 2023 and this Official Notice. The City has allocated $5,250,000 of American Rescue Plan Act (ARPA) funds to complete the construction of this very important piece of the City's water resiliency plan. The budget includes all project costs including all design fees (internal and external), land acquisition costs, permitting, construction, and construction management. The City's email system will not accept files larger than 10MB, if your proposal exceeds that limit please provide your submission via a digital drop box or FTP of your choosing and provide download instructions in your submission email. Proposer certifies that their proposal has been made without connection to any other vendor and is, in all respects, fair and without collusion or fraud, and is made with the understanding that no elected official or Wauwatosa City employee has an interest, directly or indirectly, unless otherwise stated. The City of Wauwatosa reserves, exclusively to itself, the right to reject any or all proposals or to accept the proposal deemed most advantageous to the City and to waive any, or all, technicalities or informalities in submitted proposals. No proposals, alterations, or modifications to proposals shall be allowed after the official date of submission. PATENTED DEVICES, EQUIPMENT AND PROCESSES: It is understood and agreed that without exception, bid prices include all royalties and costs arising from patents, trademarks, and copyrights. The successful bidder shall, in all cases, indemnify and save harmless the City of Wauwatosa from any and all claims for infringement by reason of the use of any such patented design, device, material, or process to be used or delivered, and shall indemnify the said City of Wauwatosa for any cost, expense, and damage which it may be obliged to pay by reason of such infringement, at any time during or after delivery. Consultants are not permitted to contact individual City Council members or other City staff for clarification of the RFP. The Method of Contractor Selection has not been Determined at this time

Award

Water / Sewer

$600,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
77
Bidding Soon
1,152
All Active Projects
459
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

To Be Determined, Wauwatosa, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.