BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Jerome, Idaho. Completed plans call for the addition of a 51,000-square-foot, one-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Starr Corporation is the CM/GC for this project. Starr will collect bids and then open them with a representative of the owner. Please contact Michael Arrington via email at michael@starrcorporation.com with questions. Scope of work includes the following: o Provide and install kitchen equipment as shown on schedules on Sheet A-3.7. o Provide and install food service equipment as shown in specification section 114000. o Provide and install hoods H1.1, H1.2, and H1.3. o A secure storage site, on campus, will be provided by the owner for the contractors use. This will allow for early procurement of equipment. o Scope of work to include setting each piece of equipment in place. Scope includes unpacking and removing protective materials. Electrical, water, waste, gas, and duct hook up is excluded from this scope of work. o Scope of work includes start up and training. Phasing and Schedule: o Notice of Award-March 10, 2023 o Full submittal package to Starr for review on, or prior to, March 31, 2023. o Equipment Installation June 2024 Starr Corporation is the CM/GC for this project. Starr Corporation may elect to submit proposal(s) on bid packages. Starr Corporation's proposal will be submitted no later than 12:00 PM on the bid date. This early bid delivery is designed to give all bidders an assurance of an open, competitive, and fair bidding environment. Special Bid Instructions: 1) Substitution Requests will be received through Thursday, 5/11/23, only. 2) Pre-Bid RFI's will be received through Monday, 5/15/23, only. The Work of Project is defined by the Contract Documents and consists of the following: 1. Approximately 12,000 sqr. ft. of new single story elementary school construction, approximately 51,000 sqr. ft. of existing elementary school building remodeling with various types of alterations, along with related exterior site work and playground improvements as indicated in the Contract Documents.

Post-Bid

Educational

$300,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
4
Bidding Soon
56
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2023

September 1, 2023

img_map_placeholder

600 N Fillmore St, Jerome, ID

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.