EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Evans, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work for the 2023 Asphalt Reconstruction Project consists of (3) Three separate projects. The first project will be a full Asphalt Reconstruction of Empire Street from 31st Street to 35th Street, the second Project will be a (3) Three inch Mill and Overlay of 42nd Street from Industrial Parkway to 17th Avenue, and the third project will be a (2) Two inch Mill and Overlay of 34th Street from 35th Avenue to Stampede Drive. Buyer's Requirements General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % Question Acceptance Deadline 02/28/2023 11:00 AM EST Questions are submitted online No The Evans City Manager reserves the right to reject any or all bids, to waive any informalities in bids, and to accept the bid that is in the best interests of the City of Evans, Colorado.

Bid Results

Roads / Highways

$623,318.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Submittals, Bonds
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
52
Bidding Soon
957
All Active Projects
416
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

May 30, 2023

img_map_placeholder

Multiple Locations, Evans, CO

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Asphalt Reconstruction Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.