Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 3, 2023 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in West Bend, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
A portion of this project is funded by the State of Wisconsin Local Road Improvement Program (LRIP). Significant types of work and approximate quantities include: Furnish and Install Sanitary Sewer Main and Laterals 1,400 LF Furnish and Install Sanitary Sewer Manhole 6 EA Furnish and Install Water Main and Services 1,600 LF Furnish and Install Hydrant Assembly 2 EA Furnish and Install Storm Sewer Main and Lead 1,250 LF Furnish and Install Storm Sewer Manhole 8 EA Furnish and Install Storm Sewer Catch Basin 12 EA Furnish and Place Concrete Curb and Gutter 2,500 LF Furnish and Place 4-Inch Concrete Sidewalk 1,450 SF Furnish and Place 6-Inch Concrete Driveway and Sidewalk 4,030 SF Furnish and Place Base Aggregate Dense 2,050 CY Furnish and Place Breaker Run, Incl. Overexcavation 1,000 CY Furnish and Place Asphalt Pavement, 4-Inch 1,250 TN Furnish and Place Topsoil, Seed, Fertilizer, Mulch and Water 3,500 SY Contract 23-01 a unit price contract. The estimated quantities as indicated above and in the Bid Proposal are inserted only for the purpose of determining the low bidder. The City of West Bend, Wisconsin, reserves the right to reject any or all bids, subject to the provisions of Sections 62.15 and 66.0901 of the Wisconsin Statutes. No bid shall be withdrawn for a period of 60 days after the scheduled time of opening bids. The letting of work described herein is subject to the provisions of Section 66.0901 Wisconsin Statutes, as it applies to work done under this contract. No bid will be received unless accompanied by a Certified Check or a Bid Bond equal to 5% of the bid, payable to the City of West Bend, Wisconsin, as a guarantee that, if the bid is accepted, the successful bidder will execute and file the contract and payment and performance assurances, forming a part of the Specifications, within 10 days after the award of the contract. The payment and performance assurances must be for an amount at least equal to the contract price and must be in the form of a bond, an irrevocable letter of credit, or an escrow account acceptable to the City. In case the bidder fails to file such contract, performance bond, and payment bond, the amount of the check or bid bond shall be forfeited to the City as liquidated damages (Section 62.15(3) of Wisconsin Statutes). All questions regarding the project shall be directed to Mitch Leisses of Kunkel Engineering Group at (920) 210-6330 or mleisses@geo-logic.com.
Award
Water / Sewer
$1,106,153.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2023
April 10, 2023
Laurel Dr S, West Bend, WI
Related To This Project
West Bend, WI
Bid Date: Mar 24 2023
West Bend, WI
Bid Date: Apr 03 2023
West Bend, WI
Bid Date: Apr 14 2023
West Bend, WI
Bid Date: Feb 08 2023
West Bend, WI
Bid Date: May 25 2023
West Bend, WI
Bid Date: May 25 2023
West Bend, WI
Bid Date: Mar 13 2023
West Bend, WI
Bid Date: Mar 10 2023
West Bend, WI
Bid Date: Mar 09 2023
West Bend, WI
Bid Date: Feb 20 2023
West Bend, WI
Bid Date: Feb 24 2023
West Bend, WI
Bid Date: Sep 14 2021
West Bend, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.