BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lebanon, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Bids shall be taken from Prime Contractors pre-qualified by the Public Works Certification Board in the following classification(s): 1542.02-Commercial Buildings (Office, Stores, Restaurants) and 1611.01- Concrete Construction of Roads & Curbing or 1711.01 Concrete Construction. The Specified construction period is 730 calendar days. The State of Indiana reserves the right to reject any and all bids. Project Goal of 7% MBE, 5% WBE and 3% IVOSB. PROJECT NUMBER: 06002001-22-060-C1 It is PSI's understanding that Janssen and Spaans Engineering is gathering information with regards to the proposed reconstruction of two rest areas along I-65. The I-65 North Bound Truck Parking and the I-65 South Bound Rest Area are located approximately 7 to 8 miles north of Lebanon, Indiana, respectively. The project includes demolition of the existing structures and removal of the parking lot and on-ramp/offramp pavements. Further, the project includes construction of new trucker restrooms and approximately 75 truck parking spaces at each site. Project Location: Highway 65, Lebanon, Indiana. 1. Drawing Set # 1: Toilet Out Buildings # 1 & # 2 and Dumpster - North Bound 1) All work within the building perimeter and the associated exterior perimeter of the building required for footing installation. 2) Exterior and interior masonry wall construction, Glue Laminated wood beams and laminated wood deck, Sheet metal panels/soffits and trim, Standing seam metal roof, Concrete slabs on grade, Interior finishes. 3) All plumbing, mechanical and electrical work within the building perimeter and remote air handling units. 4) Power distribution between Toilet Out Buildings # 1 & # 2. 2. Drawing Set # 2: Service Building - North Bound: 1) All work within the building perimeter and the associated exterior perimeter of the building required for footing installation. 2) Exterior wall construction, Laminated structural beams and laminated wood deck, Sheet metal panels/soffits and trim, Standing seam metal roof. 3) All plumbing, mechanical and electrical work within the building perimeter. 3. Drawing Set # 3: Toilet Out Buildings # 1 & # 2 and Dumpster - South Bound 1) All work within the building perimeter and the associated exterior perimeter of the building required for footing installation. 2) Exterior and interior masonry wall construction, Glue Laminated wood beams and laminated wood deck, Sheet metal panels/soffits and trim, Standing seam metal roof, Concrete slabs on grade, Interior finishes. 3) All plumbing, mechanical and electrical work within the building perimeter and remote air handling units. 4) Power distribution between Toilet Out Buildings # 1 & # 2. 4. Drawing Set # 4: Service Building - South Bound: 1) All work within the building perimeter and the associated exterior perimeter of thebuilding required for footing installation. 2) Exterior wall construction, Laminated structural beams and laminated wood deck, Sheet metal panels/soffits and trim, Standing seam metal roof. 3) All plumbing, mechanical and electrical work within the building perimeter. 5. Drawing Set # 5: Site - North Bound: 1) Traffic Maintenance: Install closure signs on all Rest Area signs along I-65. Coordinate with INDOT TMC to show the truck spots as unavailable. Post advanced warning signs of the closure two weeks prior. 2) Removals: Install appropriate erosion control before beginning work. All existing infrastructure is to be removed. Remove all buildings, ancillary structures, pavement, drainage structures, pipes and culverts. Culverts on the ramps are to be left in place. Remove existing light poles including foundations. Remove existing cameras and poles including foundations. Remove the existing traffic monitoring equipment. Store the cameras, poles and traffic monitoring equipment for reuse. Remove existing wastewater treatment plant, lift station and force main in accordance with IDEM standards. Trees outside the construction limits shall not be disturbed or removed. 3) Grading: Strip topsoil from site and store for future use. Rough grade site to new grading plan. Excavate detention pond and place liner. 4) Inground Work: Install all drainage features and utilities including power, telecommunications, sanitary sewer and water lines 5) Paving: Install concrete paving in the truck parking lots. Construct sidewalks and curbs. Lighting and ITS: Install new light poles and luminaires. Standard INDOT poles are to be used in the truck parking lot. Reinstall the cameras and traffic monitoring equipment on new foundations. 6) Finish grading and seeding: Finish grade the site and place the topsoil in the planting areas. Seed all other bare areas not indicated in Drawing Set # 5. 7) Commissioning Check all mechanical and electrical features for proper operations. 6. Drawing Set # 6: Site - South Bound: 1) Traffic Maintenance: Install closure signs on all Rest Area signs along I-65. Coordinate with INDOT TMC to show the truck spots as unavailable. Post advanced warning signs of the closure two weeks prior. 2) Removals: Install appropriate erosion control before beginning work. All existing infrastructure is to be removed. Remove all buildings, ancillary structures, pavement, drainage structures, pipes and culverts. Culverts on the ramps are to be left in place. Remove existing light poles including foundations. Remove existing cameras and poles including foundations. Remove the existing traffic monitoring equipment. Store the cameras, poles and traffic monitoring equipment for reuse. Remove existing lift station and force main in accordance with IDEM standards. Trees outside the construction limits shall not be disturbed or removed. 3) Grading: Strip topsoil from site and store for future use. Rough grade site to new grading plan. Excavate detention pond and place liner. 4) Inground Work: Install all drainage features and utilities including power, telecommunications, sanitary sewer and water lines 5) Paving: Install concrete paving in the truck parking lots. Construct sidewalks and curbs. Lighting and ITS: Install new light poles and luminaires. Standard INDOT poles are to be used in the truck parking lot. Reinstall the cameras and traffic monitoring equipment on new foundations. 6) Finish grading and seeding: Finish grade the site and place the topsoil in the planting areas. Seed all other bare areas not indicated in Drawing Set # 6. 7) Commissioning Check all mechanical and electrical features for proper operations.

Bid Results

Sidewalks / Parking Lot

$28,028,028.00

Public - State/Provincial

Paving, Site Work

436

35

8

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
36
Bidding Soon
763
All Active Projects
297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

June 12, 2023

img_map_placeholder

I-65, Lebanon, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.