BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work and paving for a road / highway in Laguna Beach, California. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of September 2025, the project is in land acquisition phase. The owner states that construction is scheduled for 2028. Plans call for adding underground utilities and multimodal access such as sidewalks and bicycle lanes. .......... The City of Laguna Beach (CITY) invites qualified consultants to submit proposals to provide professional engineering and environmental consulting services for proposed improvements to Laguna Canyon Road, State Highway SR-133, from approximately 1000' s/o Canyon Acres Drive to El Toro Road, to enhance pedestrian and bicycle circulation, transit, and roadway safety by undergrounding the existing overhead utilities and constructing key improvements. All questions related to this RFP shall be in writing and directed to Thomas Perez, Assistant Director of Public Works, at tperez@lagunabeachcity.net no later than 5:00 PM, Monday, March 13, 2023. Questions received after this date may not receive a response from the CITY. Responses to all questions received by the deadline above will be provided to all interested firms by 3:00 PM, Thursday, March 16, 2023. The CITY will be the sponsor agency through a cooperative agreement with the California Department of Transportation (Caltrans) to provide Project Approval and Environmental Document (PA&ED) for the Laguna Canyon Road Improvement project (Project). Caltrans District 12 will provide oversight of the PA&ED process. The proposed roadway improvements have been identified and preliminarily studied in a Project Study Report-Project Development Support (PSR-PDS) prepared by HDR Engineering, Inc. on behalf of the CITY and approved by Caltrans on September 27, 2022. At the request of the CITY, Southern California Edison (SCE) has begun the design of the utility undergrounding portion of the project. The underground design will be underway at the same time the PA&ED is being prepared. The CITY is requesting proposals from qualified firms to develop the PA&ED and to coordinate the design efforts with Southern California Edison (SCE) and various telecommunication utilities to underground the existing overhead utilities within the project limits. The method of Contractor Selection has not been Determined at this time.

Design

Roads / Highways

$130,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
611
Active Projects
232
Bidding Soon
4,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2028

Project location map

Laguna Canyon Rd, Laguna Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.