BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Visalia, California. Completed plans call for site work for a educational facility.

This RFQ/P seeks proposals from qualified design-build firms capable of providing comprehensive energy, gas, and water infrastructure modernizations for Visalia Unified School District ("District"). It is the intent of the District to improve the health and efficiency of its facilities through indoor air quality improvements, utility savings measures, and other operational efficiencies. To fund the program, the District "Owner" intends to utilize state programs, such as AB 841, utility incentive programs, federal programs, and/or other budget-neutral funding solutions. Upon award, the selected respondent will be required to perform districtwide site assessments to evaluate infrastructure needs and develop a scope of work tailored for the District's objectives. Specifically, the awarded respondent will evaluate and propose applicable efficiency, indoor air quality and sustainability measures including but not limited to: o Heating Ventilation & Air Conditioning (HVAC) modernizations o Ventilation improvements o Air cleaning technologies o Interior and exterior lighting upgrades o Building Automation System (BAS) installation, upgrade, or expansion o Solar, battery storage, and other renewable technology o Water conservation including touchless faucet and toilet replacements o Building envelope upgrades o Other related infrastructure improvements o Other training, remote monitoring services, and on-going support services that will ensure objectives of program are met over the term of the agreement. Once a scope of work and funding plan is approved by Staff and the Board, the selected respondent will obtain all applicable funding sources on the District's behalf. After funding is secure, the selected respondent will provide turnkey implementation services for the approved scope of work including all necessary permits, engineering, any Division of the State Architect (DSA) requirements, procurement , delivery, installation, commissioning, training, warranty service, and compliance with any applicable funding programs. After the scope of work has been fully implemented, the selected respondent will be required to provide measurement & verification services to monitor post-retrofit utility usage and track energy savings. Questions regarding this RFQ/P must be submitted in writing by email to spena01@vusd.org on or before Date at March 7, 2023 at 3:000 p.m. April 11, 2023 Board Approval

Post-Bid

Educational

$4,200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
27
Bidding Soon
418
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.