Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a mixed-use development in Marshall, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
PROJECT ST-032: LOT 2, BLOCK 1, SCHWAN'S CORP I ADDITION PARKING LOT IMPROVEMENTS PROJECT (RALCO) - This project consists of: the installation of a new 6' concrete pavement surface over the existing, in-place, aggregate base section. To accommodate the new pavement surface, the existing bituminous pavement surface willbe removed and the spot-removal of existing curb and gutter will be completed as needed to ensure positive drainage. The existing curb and gutter and drainage structures will remain in-place to the maximum extent practicable. Additional aggregate base may be added to the in-place aggregate base section as needed to ensure proper grade on the new parking lot surface. Additional curb and gutter and concrete sidewalk replacement may be completed on the southeast side of the parking lot area to provide better definition between the parking and walking areas, and to promote positive drainage. Plans and Specifications are on file at the Office of the City Engineer in the Marshall City Hall located at 344 West Main Street, Marshall, MN 56258, telephone: 507-537-6773. Vendors who desire specifications may secure them from the City Engineer. Copies of the plans and specifications will be furnished on request to any prospective bidder upon a deposit of $150.00 (non-refundable) made payable to the City of Marshall or downloaded through eGram at https://egram.ci.marshall.mn.us. Prospective bidders must register as a Plan Holder to download plans and specifications. The City Council reserves the right to reject any or all bids or any part of any bid, to waive minor defects, technicalities, or any informalities in the bidding
Award
Sidewalks / Parking Lot
$221,243.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 6, 2023
August 1, 2023
W Marvin Schwan Memorial Dr & W College Dr, Marshall, MN
Related To This Project
Marshall, MN
Bid Date: Mar 14 2023
Marshall, MN
Bid Date: Mar 09 2023
Marshall, MN
Bid Date: Mar 08 2023
Marshall, MN
Bid Date: Feb 22 2023
Marshall, MN
Bid Date: Feb 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
