BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a civil project in San Marcos, California. Completed plans call for the construction of a water / sewer project; and for the renovation of a water / sewer project.

Project consists of replacement of one (1) sanitary sewer lift station and appurtenances at 2175 Montiel Road, San Marcos, California 92609, construction of approximately 4,150 linear feet of 6-inch diameter sewer force main and appurtenances at the downstream of the lift station, rehabilitation of approximately 1,370 linear feet of 10-inch gravity sewer pipeline with manholes and appurtenances at the upstream of the lift station. The estimated construction cost is $6,250,000. The Owner designates Carlos Mendoza, P.E., Michael Baker International, as the Engineer of Record under the Contract Documents. Q&A Deadline 07/26/2023 5:00 PM (PDT)Questions regarding the project will be answered up to 5 working days before the bid opening. Because of the time necessary to notify bidders, no addenda will be issued within 5 working days of the date set for the opening of bids. Lift Station Replacement (DWG C-5 thru C-13) o Demolition and Disposal of Existing Lift Station o Sheeting, Shoring, and Bracing (Protection of Ex. Utilities) o Site Excavation and In-Situ Excessive Earth Export and Dewatering Additional Exploratory Auger Borings at LS Site (Addendum No. 1)Hard Rock approx. 18.5 - 26.0 feet beneath the existing ground Groundwater at approx. 12.0 - 18.5 feet beneath the existing groundA Special Use Discharge Permit from Encina Wastewater District would berequired for groundwater discharge to the VWD sewer system. o Construction of a New Sanitary Lift Station Cast-In-Place Concrete Works including new wet well, valve vault, concrete slabs on grade o Below grade 12' x 7' (inside dimensions) concrete valve vault o Below grade 21' x 30' (inside dimensions) wet well lift station structure o 35-40 ft deep Mechanical Improvements o Including new pumps, piping, valves, and appurtenances o Two (2) 20 HP submersible sewer pumps (1+1) with 400 gpm ultimate system flow Chemical storage area, TriOxyn chemical injection system w/ SCADA controls improvements Enviro prep mixing and suspension system Electrical, Instrumentation & Controls Improvements Outdoor permanent emergency 60-kilowatt diesel generator with 24-hour integral fuel tank and automatic transfer switch for back-up power Electrical/supervisory control and data acquisition (SCADA), antenna mast Mixing and Odor Control Equipment Vertical Construction including Electrical & Controls Room/Restroom o Installation of 45 LF of 8-inch PVC sewer o Drainage Piping o Installation of (3) 4 ft manholes (District Standard Zebron MH Liner System) o Removal and Replacement of approximately 460 LF of 6-inch ex DIP forcemain with 6-inch HDPE DR 19 forcemain o Connecting New Forcemain to Existing Forcemain o Cleaning, Plugging, and Abandoning Existing Force Main in Place o AC Paving o Yard Piping Removal & Replacement o Site Restoration o Construction of Retaining Wall o Construction of Concrete Swale

Award

Water / Sewer

$1,644,662.00

Public - County

New Construction, Renovation, Site Work

90

36

30

12

Subscribe For Documents

94 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
240
Bidding Soon
3,721
All Active Projects
1,714
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 3, 2023

October 2, 2023

July 28, 2024

img_map_placeholder

2175 Montiel Rd, San Marcos, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.