Published March 23, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Strum, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Utility Street Construction and Excavation In general, the project consists of reconstruction of approximately 600 LF of underground utilities and asphalt paving in the Oak Street/Birch Street alley between 6th Avenue and 5th Avenue, and the reconstruction of approximately 500 LF of underground utilities and asphalt paving in the Elm Street/Cedar Street alley between 5th Avenue and 4th Avenue. Provide temporary environmental controls as shown and as specified. Comply with applicable provisions of Divisions 00 and 01. 1.02 MEASUREMENT AND PAYMENT A. Environmental control items will be considered incidental to construction and the cost of such work incidental to unit bid items, unless Bid Schedule includes separate pay items. B. When Bid Schedule includes a unit price for INLET PROTECTION, payment will be made at the contract unit price for each inlet protected. Unit price shall be full compensation for furnishing, delivering, installing, maintaining, and removing inlet protection and for removal and disposal of sediment deposits. C. When Bid Schedule includes a unit price for TRACKOUT CONTROL, payment will be made at the contract lump sum price for all trackout control required on the project. Unit price shall be full compensation for furnishing, installing, maintaining, and removing trackout control.

Award

Water / Sewer

$568,554.00

Public - City

Paving, Site Work

41

27

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Trenching, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
19
Bidding Soon
383
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

June 12, 2023

img_map_placeholder

Multiple Locations, Strum, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.