Renovation of a medical facility in Tewksbury, Massachusetts. Completed plans call for the renovation of a medical facility.

Tewksbury Hospital is seeking a qualified vendor to renovate a shower room in an occupied unit in the Detox center located in the Saunders Building. Work to include demolition, painting, wall board, ceramic type flooring and walls and associated plumbing work. Renovate a Shower Room in an Occupied Unit in the Detox Center Project Timeline: The Contractor shall commence the Work on April 1, 2023 and bring the Work to completion by June 30, 2023.. The applicable minority workforce utilization percentage, if any, is 5%. The applicable women workforce utilization percentage, if any, is 5% General Scope of Work - (1) Contractor to supply all necessary equipment and materials to complete all work in a timely manner and to generally accepted professional standards. (2) All work to be done during normal working hours from 7am to 3:30pm or by agreed upon arrangement. (3) All work must be performed in accordance with the Hospital's established health, safety, building and environmental codes (4) The contractor is responsible for all necessary safety precautions, clean up and for the removal and off-site legal disposal of all debris generated from this project. (5) The selected contractor shall not engage in any "billable" work resulting from changes in scope without prior written authorization from Tewksbury Hospital. Failure to obtain prior written authorization from Tewksbury Hospital may result in non-payment for the disputed service. (6) Contractor must supply "time and materials" billing rates and standard markups for labor and materials for any out ofscope work. (7) Proposals must not be based solely on the information provided in the RFQ, or by the contract user. The contractor is responsible for examining all existing conditions and anticipating, based on his/her experience, likely hiddenconditions that may exist. (8) Contractors must make their own estimates ofthe amount of work needed. Contractors will not be entitled to any additional compensation for any discrepancies as a result ofthe contractor's own estimating error or omission. (9) Two (2) sets of specification sheets (cut sheets) for all materials to be used for this project are to be approved by ewksbury Hospital Contract Manager and/or Maintenance Coordinator before materials and equipment can be ordered. (10)Three (3) complete sets of all MSDS sheets for all paints, caulking, adhesives and other chemicals or materials are to be filed with the Tewksbury Hospital Contract Manager or Maintenance Coordinator upon award ofthe contract before work can begin. (11)All technicians/tradespeople are to be OSHA 10 certified (12)Criminal Offender Record Information Check. (a) All employees and/or prospective employees ofContractor, Trade Contractors and Subcontractors working on this project are subject to a CORI (Criminal Offender Record Information) check pursuant to chapter 6 ofthe Massachusetts General Laws. (b) DPH, in conjunction with EOHHS Human Resources, will conduct CORI checks pursuant to 101 CMR 15.00. For purposes ofthis Agreement, DPH will be in the role ofHiring Authority, as defined in 15 CMR 15.04. (c) DPH, as the requester, and pursuant to 15 CMR 15.06(2)(b), authorizes the General Contractor to obtain and submit CORI forms for all personnel who will be on the site prior to that person being allowed on the site. (d) Refer to the CORI REQUEST FORM in the Appendices. (e) All on-site personnel will be required to be CORI checked before being allowed on site. (13)A11 measurements are to be field verified before material and equipment is ordered. (14)A11 required permits and notifications are the responsibility ofthe contractor. Copies of all permits are to be filed with the Tewksbury Hospital Maintenance Coordinator or Contract Manager upon award ofthe contract and before the work can begin. (15)Tewksbury Hospital will not pay for fuel charges, truck charges, transportation charges or any other charges related to fuel or additional fees beyond the listed scope ofwork. (16)Payment processing will be contingent on receiving properly filled out and completed certified payroll forms, customer acceptance, and compliance sheets with invoice. (1) Shower Dimensions (a) Shower dimensions for shower room (i) Shower room approximately 18 x 20 (ii) Shower consists of 4 various size showers (2) Demolition/Set-Up (a) Dust mitigation to be accomplished by a wet method and the proper use of a HEPA machine if possible (b) An enclosure shall be built, with a door, outside one ofthe entries to the shower to accommodate additional working space (c) Remove all wall tile and associated backing down to the concrete block (i) Tile to be removed from all wall surfaces within the area (d) Remove all floor tile and substrate to the deck protecting existing floor drain (e) All debris leaving the area shall be removed in a covered cart or barrel to a dumpster or truck at a location designated by the hospital ' (f) Dry out and prepare shower floor and wall for installation on new floor and wall system. (g) Install proper substrates as required by floor and wall system manufacturer (h) Floor system will be pitched in such a way that all water will flow towards the floor and shower drains (1) Shower installation (a) All walls from floor to ceiling and floor are to be lined with shower pan liner similar or equal to Chloraloy showerpan liner. . (b) All seams are to be overlapped and sealed using adhesive similar or equal to Noble weld 100 (c) Lightweight concrete to be used to set the base for installation of ceramic floor tile. (d) All flooring to be designed to pitch to all floor and shower drains (e) Ceramic floor tile shall be heavy duty, 2"by 2" similar or equal as manufactured American Olean, color and design to be determined (f) Color of grout to match tile color and shall be sealed with a sealer similar or equal to Miracle Sealants 511 Impregnator Penetrating Sealer (g) Cover walls with '/a" Dura-rock or Hardy board. (h) All dura-rock shall be glued and mechanically fastened to existing concrete walls and all seams are to be caulked with a waterproof caulking similar or equal to DAP Silicon Max . (i) Ceramic wall tile shall be heavy duty, 12"by 24" similar or equal as manufactured American Olean, color and design to be determined (j) Grout line shall be 1/8" or less (k) Color of grout to match tile color and shall be sealed with sealer similar or equal to Miracle Sealants 511 Impregnator. Penetrating Sealer (l) Vertical and horizontal grab bars, a minimum of 2 properly sized shower rails shall be securely installed, vertically and horizontally in each shower. Locations to be determined ' . (2) All ceilings, door trims, access panels to be painted with mold and mildew resistant paint. Ceiling paint to be high gloss white. Color to be determined. (6) At completion ofthe work the area will be thoroughly cleaned and disinfected. Alternate #1 Plumbing work = (i) Plumbing to be in accordance with the latest edition ofthe Massachusetts Plumbing Code (ii) 4 Surface mount ligature resistant hide-a-pipe shower systems shall be supplied by Tewksbury Hospital and installed by contractor. (iii) Existing shower devices, floor drains and associated plumbing equipment shall be removed back to the chase wall and reinstalled over the ceiling to the shower system (iv) Isolation valves, hot and cold, to be installed for each ofthe 4 shower devices (v) All drains shall be similar or equal to those manufactured by Zum (vi) Alffloor drains shall be 3" and designed to be installed in ceramic tile floor. (vii)Floor drains are accessible on the basement level (viii) Drainpipe shall be similar or equal to the epoxy coated green type

Bid Results

Medical

$139,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
142
Bidding Soon
2,842
All Active Projects
1,135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

April 1, 2023

img_map_placeholder

365 East St, Tewksbury, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.