BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Burlington, Massachusetts. Completed plans call for the renovation of a multi-residential development.

Remove and replace vinyl siding and exterior trim with the same brand and color as existing; Remove and replace 13 windows with new windows and screens. Windows and screens to be provided by the owner; Remove and replace three exterior doors. Doors to be provided by the owner; Remove and replace all sheetrock from the exterior walls and in the bathroom and kitchen; Update electrical and plumbing to code in the bathroom and kitchen; Install new electrical panel with upgraded service; Remove three layers of flooring one being Asbestos containing material Asbestos removal to be provided by the owner; Fill existing unused vents in the floor with concrete; Insulate exterior walls and ceilings per code; Install blueboard and plaster on bathroom walls and patch where needed; Remove and replace all interior doors and trim. Doors and trim stock to be provided by the owner; Install new engineered flooring throughout; Install new kitchen cabinets and countertops in the kitchen. Cabinets and countertops to be provided by the owner; Install new toilet, tub, and vanity with sink and med cabinet. Fixtures to be provided by the owner; One coat of primer and two coats of paint in all rooms. Primer and paint to be provided by the owner. Rehabilitation of Town-owned Affordable Housing Unit at 119 S. Bedford Street The project work schedule will be determined upon final contract as authorized by the Superintendent due to window and door delivery lead time. Towns Designated Representative and point of contact for questions is: Frank Anderson,Superintendent DPW Buildings & Cemeteries Division 25 Center Street Burlington,MA01803 fanderson@burlington.org 781-552-9226

Bid Results

Multi-Residential

$115,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
150
Bidding Soon
2,862
All Active Projects
1,153
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

April 7, 2023

img_map_placeholder

119 S Bedford St, Burlington, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.