BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Memphis, Tennessee. Completed plans call for the renovation of a educational facility.

In achieving this established project goal, the MWBE participation goal of 41.3% is defined as the total dollar value of the subcontracts awarded to certified minority business enterprises (MBE), or certified woman-owned business enterprises (WBE), divided by the total dollar value bid amount. The SCBE requests bids for BAYER AR BUILDING RESTORATION - REBID. Removal and replacement of damaged ceiling tiles, Paint existing grid. Remove and replace damaged flooring (carpet tiles/VCT/wood). Remove and replace damaged cove base. Remove damaged wallpaper. Sand and paint walls. Repair damaged sheetrock walls. Remove and replace existing millwork and countertops. Dust control and air filtering to be implemented for drywall repairs. Potential falldown of fire-retardant material above ceiling grid may result in additional cost of abatement. Please reference the attached spreadsheet for quantities and drawings for locations where work is to be performed. Field verification is suggested. Submit a schedule with major milestones and a project timeline. The specifications are contained in the Design Project Manual. Responses submitted must meet or exceed all requirements. Bids that do not meet or exceed all requirements will be considered non-responsive. Additional scope information is provided (See pp. 12-13 for the detailed scope of services and link to access drawings/specifications). Bayer AR Building Restoration The Designer may be requested to assist in providing a detailed scope of work to include due diligence specifically related to the project site. This due diligence shall require but not be limited to the following: 1. Boundary, Topographical & Utility Site Survey 2. Tree Density Survey 3. Preliminary Geotechnical Report 4. Primary Geotechnical Exploration Report 5. Phase 1/ Environmental Assessment Study 6. Traffic Impact Study 7. Historical & Archeological Property Survey 8. Protected Species Assessment 9. Wetland Delineation, Assessment, & Consultation Questions Due February 27, 2023 2:00 PM Questions or requests for clarification of technical issues and terms pertaining to this Bid must be submitted in writing via e-mail to LaJuanna Jones-Sulton at jonessultonlm@scsk12.org and Mary Taylor at taylorm15@scsk12.org The SCBE requests bids for BAYER AR BUILDING RESTORATION. Removal and replacement of carpet, removal and replacement of cove base throughout, removal and replacement of wood flooring in executive suite, removal and replacement of wallpaper, removal and replacement of fluorescent lights, painting and other items detailed in the extensive Scope of Work. The specifications are contained in the Design Project Manual. Responses submitted must meet or exceed all requirements. Bids that do not meet or exceed all requirements will be considered non-responsive. Additional scope information is provided (See pages 14 for the detailed scope of services and link to access drawings/specifications) Shelby County Board of Education (SCBE) is the legal name of the Memphis-Shelby County Schools (MSCS) district. MSCS is Tennessee's largest public school district and is among the 25 largest publicschool districts in the United States. MSCS serves approximately 110,000 students in 207 schools. We employ more than 6,200 teachers and 6,000 support personnel to serve our unique student population while offering programming and services to fit the needs of all our students. Memphis-Shelby County Schools has created a data-driven culture that serves as the backdrop for strategic decision-making and informed solution-based decisions. The information gleaned from data, researchbased strategies, and performance outcomes provides our district with amazing opportunities to offer highquality educational options to every student. The MSCS mission is to prepare all students for success in learning, leadership, and life through three strategic initiatives. The initiatives are: 1. Strengthen Early Literacy (K-2) and Continuing Literacy (3-12) 2. Recruit, Retain, Immerse, and Entrench 3. Relevant, Rigorous, and Equitable Academics The Scope of Work for the BAYER AR BUILDING RESTORATION shall include and not be limited to the following: o AR Building 6th Floor Remove and replace carpet throughout. (Colors to be determined.) o Remove and replace cove base throughout. (Colors to be determined.) o Remove and replace wood flooring in executive suite. (Material and color to be determined.) o Remove all existing wallpaper and paint walls throughout. (Colors to be determined.) o Repair all damaged sheetrock walls. Remove and replace all ceiling tile. o Paint existing grid. o Replace only damaged areas. o Replace all existing ceiling mounted fluorescent light fixtures with LED fixtures. o Replace plumbing fixtures throughout. Check HVAC, plumbing and sprinkler lines for leaks and operability. o Repair and support all data, telecommunication and coax cable runs. 3rd Floor o Same scope as 6th floor with the exception of removal / replacement of carpet. Carpet is in good condition. 1st Floor (M) Remove and replace all ceiling tile. Paint existing grid. Replace only damaged areas. o Remove all existing wallpaper and paint walls throughout. (Colors to be determined.) o Replace all existing ceiling mounted fluorescent light fixtures with LED fixtures. o Repair and support all data, telecommunication and coax cable runs. Paint all doors. (Colors to be determined.)

Post-Bid

Educational

$500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
67
Bidding Soon
724
All Active Projects
314
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 18, 2023

September 1, 2023

December 1, 2024

img_map_placeholder

3030 Jackson Ave, Memphis, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.