BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Hale Township, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Each Bid Must Be Accompanied by Either a Bid Bond in the Amount of 10% of the Bid Amount With a Surety Satisfactory to Hale Township, or by Certified Check, Cashiers Check, or Letter of Credit Upon a Solvent Bank in the Amount of Not Less Than 10% of the Bid Amount in Favor of Hale Township. Bid Bonds Shall Be Accompanied by Proof of Authority of the Official or Agent Signing the Bond. Attention of Bidders is Called to All of the Requirements Contained in the Bid Packet, Particularly to the Various Prevailing Wage Rates, Equal Opportunity Provisions, and the Requirement for a Bid Guaranty and a Performance Bond for 100% of the Contract Price. Attention of Bidders is Called to All of the Requirements Contained in the Bid Packet, Particularly to the Various Prevailing Wage Rates, Equal Opportunity Provisions, and the Requirement for a Bid Guaranty and a Performance Bond for 100% of the Contract Price. Each Proposal Must Contain the Full Name of the Party or Parties Submitting the Proposal and All Persons Interested Therein. Each Bidder Must Submit Evidence of Its Experience on Projects of Similar Size and Complexity. The Owner Intends and Requires That This Project Be Completed No Later Than October 1, 2023. All Contractors and Subcontractors Involved With the Project Will to the Extent Practicable Use Ohio Products, Materials, Services, and Labor in the Implementation of Their Project. Additionally, Contractor Compliance With the Equal Employment Opportunity Requirements of Ohio Administrative Code Chapter 123 is Required. No Bidder May Withdraw His/her Bid Within Thirty (30) Days After the Actual Date of the Opening Thereof. Hale Township Reserves the Right to Waive Any or All Informalities and/or to Reject Any or All Bids. Selection of Bids Will Be Based on Lowest and/or Best Bid. The Owner intends for the Contractor to begin construction once a Contract is signed and that the project to be completed in full by October 1,2023.

Post-Bid

Roads / Highways

$134,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
7
Bidding Soon
1,215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

April 5, 2023

Project location map

Township Rd 234, Hale Township, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.