BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Flagstaff, Arizona. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The City of Flagstaff (Owner) is seeking Statements of Qualifications (SOQs or Proposals) from Arizona licensed Contractors (Contractor) to provide Construction Manager at Risk (CMAR) Design Phase and Construction Phase Services to: Coordinate with Design Professionals selected by the Owner and assist in: (1) the design of the Cinder Lake Landfill Road (Forest Service Road 6010) Improvement Project (the Project); and (2) to construct the Project. The Project consists of approximately 2 miles of asphalt removal and replacement along with drainage improvements. The Project will be delivered through the CMAR Design Phase and Construction Phase alternative project delivery process. The CMAR Design Phase Services will primarily include reviewing and providing input on design, plans, schedules, quantities, costs estimates, subsurface utility investigations, sequencing of the Project, and constructability in coordination with Design Professionals selected by the Owner to prepare comprehensive construction documents and develop Guaranteed Maximum Prices (GMPs) for the Project. The CMAR Construction Phase Services will generally consist of construction of the Project and coordination with various agencies, stakeholders, and the public during construction. The primary improvements consist of roadway construction and stormwater conveyance improvements. This Project is financed with funds primarily from the Owner's Solid Waste Section and contributions from Coconino County. The selected Contractor will be expected to enter into a separate Design Phase Service Agreement and Construction Phase Service Agreement. The Design Phase Service Agreement and Construction Phase Service Agreement will be awarded at the Owner's discretion. Contracted services and associated fees will be negotiated after a qualified Contractor is selected. Project Type RFQ (Request for Qualification) Response Types Response File Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Requests for clarifications/questions must be received no later than 3:00 P.M., Wednesday March 15, 2023

Final Planning

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

33

13

4

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
68
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

June 12, 2023

img_map_placeholder

Cinder Lake Landfill Rd, Flagstaff, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.