BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Dunn, North Carolina. Completed plans call for the renovation of a educational facility.

The project consists of the removal of existing built-up asphalt roof at this location as indicated in Drawings. This is a full roof replacement project. Roof shall be replaced with new ISO insulation board and new PVC membrane. Single prime bids shall be accepted in accordance with G.S. 143-128. Requirements for bidding this project are as follows: 1. References: Three (3) references from previously satisfied commercial customers. 2. Furnish NC License Number (G.S. Chapter 87 establishes licensing requirements for general, plumbing, heating, electrical, and refrigeration contractors for construction projects costing $30,000 or more). 3. Insurance - The Contractor shall provide, as required by law, insurance for his employees. 4. Workman's Compensation 5. Recruitment of minority business participation in accordance with G.S. 143-128. 6. Bid Bond is required. 7. Certain Minority Business Enterprises (MBE) guidelines must be followed. 8. Bids submitted via facsimile (FAX) machine in response to this Invitation to Bid shall not be accepted. Bids are subject to rejection if they are not submitted on the provided Bid Form. 9. Firm quote: Prices and any other entry made hereon by the bidder shall be considered firm and not subject to change or withdrawal. 10. Descriptive Literature: All bids must be accompanied by complete descriptive literature, specifications and other pertinent data necessary for their evaluation as required by the attached General Conditions, otherwise they shall be subject to rejection. 11. Mailing Instructions: It is the responsibility of the bidder to have the bid in this office by the specified time and date of opening. Bid shall be sent via certified mail or hand delivered to Bid Opening. Overnight delivery is strongly recommended if mailing. Mail only one fully executed bid document, unless otherwise instructed, and only one bid per envelope. Address envelope and insert bid as shown below: Cut along the outer border and affix this label to your sealed bid envelope to identify it as a "Sealed Bid". Neither faxed nor electronically submitted bids shall be accepted. Be sure to include the name of the company submitting the bid where requested. Submit one (1) Bid copy. Submit all questions in writing to Engineer, Jenkins Consulting Engineers. EMAIL: jcebids@jenkinsce.pro B. All RFI must be received via email no later than 7:00 pm Wednesday March 8, 2023 in order to receive a response. RFI received after this time will not be answered. Base Bid work consists of removal and replacement of existing built-up asphalt roof at locations identified in Drawings. Roof shall be replaced with ISO insulation board and PVC membrane. Work also consists of removal and replacement of existing fiberglass shingle roof and metal panel roof at building identified in Drawings. This roof shall be replaced with painted metal roof panels. The work of this project is defined in the Contract Documents and includes, but may not be limited to the following: 1. Removal of existing built-up roof over gypsum concrete deck. Gypsum concrete deck shall remain. 2. Removal of existing built-up roof over concrete plank deck. Concrete plank roof deck shall remain. 3. Removal of existing built-up roof over steel deck. Steel roof deck shall remain. 4. Removal of existing built-up roof over T&G wood plank decking. T&G wood plank roof deck shall remain. New 1/2" plywood shall be installed over existing T&G wood plank roof deck. 5. Removal of existing gutters and downspouts. 6. Cleaning of existing surfaces to remain. 7. Installation of self-adhered vapor barrier to each existing roof deck. 8. Mechanical attachment of new ISO insulation board at steel deck, plywood sheathing, or T&G wood plank deck only. 9. Adhesive attachment of new ISO insulation board at Gypsum concrete and Concrete plank decks. 10. Installation of fully adhered cover board and PVC membrane. 11. Removal of the existing fiberglass shingle roof shown in Drawings. 12. Removal of existing metal panel roof shown in Drawings. 13. Cleaning of existing surfaces to remain. 14. In areas where the Contractor and Engineer determine that steel deck or other roof deck needs to be repaired or replaced due to deterioration, Contractor shall ensure that concealed spaces above lay-in ceilings are free from roof debris resulting from roof deck replacement. 15. Any additional debris dumped on ceiling or room below resulting from roof deck replacement or other roof replacement work (roof curb replacement, roof hatch replacement, pitch pocket replacement, etc.) shall be cleaned to the satisfaction of the Owner. 16. Contractor shall take adequate precautions to protect or relocate existing furniture or equipment under areas where roof deck shall be replaced prior to beginning that work. 17. Installation of Ice and Water shield membrane over plywood sheathing. 18. Installation of painted metal roof panels with Kynar finish. 19. Installation of new gutters and downspouts (if Alternate is accepted). 20. Reinstallation of existing gutters and downspouts (if Alternate is not accepted.) 21. Clean up and removal of all excess materials and other products of demolition. 22. On-site storage and work facilities as necessary to execute the work on the site of the school. B. HVAC unit removal requirements 1. Existing RTU curbs shall be replaced with new curbs as part of base bid. Materials and labor required for removal, reinstallation, and restarting of existing HVAC units shall be included in base bid. Licensed HVAC contractors and Electrical contractors shall be used. Roofing contractor shall coordinate all work with HVAC and Electrical contractors as required. a. Only RTU curb itself shall be replaced. Curb adapters can be reused. b. Install new curb to fit existing curb adapters. c. Minimum curb height shall be 8" above finished PVC membrane surface. 12" or 14" curbs shall be used as required to achieve 8" minimum clearance above PVC membrane. d. Supply and return ductwork shall be extended if required to fit new curb. e. See Keynote #3 in Drawings. 2. HVAC units shall be inspected for functional operation prior to removal. Units that are not functioning prior to removal or adjustment shall be noted, logged, and reported to Sampson County Schools Personnel. HVAC units that are functioning and are removed or adjusted shall be reinstalled and restarted in working order by licensed HVAC contractors.

Post-Bid

Educational

$800,000.00

Public - County

Renovation

14

15

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
61
Bidding Soon
1,187
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2023

April 12, 2023

img_map_placeholder

1500 Midway Elementary School Rd, Dunn, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.