BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Gretna, Louisiana. Contact the soliciting agency for additional information.

Two (2) Year Contract to Provide Labor, Materials and Equipment Necessary to Remove Existing and Install New Thermoplastic Pavement Markings for the East and West Bank of Jefferson Parish for the Department of Engineering - Traffic Engineering Division A LA State Contractor's License will be required in accordance with LSA R.S. 37-2150 et. seq. and such license number will be shown on the outside of the bid electronic envelope. Failure to comply will cause the bid to be rejected. When submitting the bid electronically, the license number must be entered in the appropriate field in the electronic procurement system. Failure to comply will cause the bid to be rejected. BID BOND: A bid bond is required with bid submission in the amount of 5% of the total bid. PERFORMANCE BOND: A performance bond in the amount of 100% of the contract amount will be required at the signing of the formal contract The following specifications describe the materials required for a two-year contract to provide labor and material to install and /or remove retroreflective pavement marking at various West Bank locations. The locations shall be determined by Jefferson Parish Traffic Engineering Division. The markings shall include but not be limited to: Raised Pavement Markers, Longitudinal Pavement Marking, and Preformed Letters, Legends, Symbols, High Friction Surface Overlays and Modular Lane Separator Systems. All material and legends shall conform to these specifications and to those listed in the Manual of Uniform Traffic Control Devices, 2009 Edition. As detailed in a written Notice-to-Proceed (NTP) directive, all locations for installation / removal shall be determined by the Jefferson Parish Traffic Engineering Division. Upon notification, the contractor shall mobilize within 14 days after notification and complete the individual job assignment within 30 days or be assessed liquidated damages in the amount of one percent (1%) per day thereafter of the cost of the individual job assignment. After 100 days, the job shall be installed free of charge with the exception of mobilization charges.

Post-Bid

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
34
Bidding Soon
518
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

April 21, 2023

img_map_placeholder

Multiple Locations, Gretna, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.