BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Hill Air Force Base, Utah. Working plans call for the renovation of a military facility.

Notice ID- W9123823S0021 An Industry Day is being conducted by the U.S. Army Corps of Engineers, Sacramento District - Utah Satellite Office and all interested Offerors are welcomed to attend. The purpose of this industry day: Our goal is to familiarize industry with all aspects of the project, there will be a presentation of the project requirements, a question-and-answer period, and a tour of the project site[RLTCUC(1] . The purpose of this event will be to facilitate communications among the USACE-Sacramento District project team and industry representatives specific to this project. USACE will present information regarding the draft requirements and encourage networking among vendors and the USACE Sacramento District team. The existing Plating Shop at Hill AFB will host a site visit at Building 505 to provide industry representatives with a current operational picture of the facility's layout and workflow process. Any personnel attending the B505 site visit will be required to independently gain entrance to Hill AFB, a secure military installation. [RLTCUC(2] The Plating Shop Renovations Project Manager, Technical Lead, Discipline Design Leads, Environmental Leads and Contracting Officers will be available during the industry day event to discuss and/or answer questions related to the project. Project Description: Plating Shop Renovations, Hill Air Force Base, Utah REPAIR. Modernize Building 505 plating processing. The existing structure consists of reinforced concrete footings, reinforced concrete basement slabs, concrete masonry unit (CMU) walls supporting structural steel framing for tanks, operating floor, aisleways, bridge cranes, roof, and heating and ventilation air condition equipment on the roof. The plating tanks, along with columns, framing, and grating and most of the surrounding operating floor will be replaced. The existing aisleways and roof construction will be reused as much as possible. The roof structure will be modified to provide proper crane support. The floor will be repaired to provide support of new tanks. The chemical resistant coatings on the floor, walls, and ceilings will be refurbished. The ventilation will be updated for the chemical process. Government furnished equipment (GFE) tanks with necessary support equipment will be replaced. The tank plumbing will be connected to Industrial Waste Treatment Plant (IWTP) lines. The electrical system will be updated for busways, feeders, panelboards, circuits, receptacles, instrumentation and controls and other components that need updated. Lighting will be revised, and new lights added for adjusted plating process. The fire suppression system will be updated for plating processing changes. Eyewash stations and other required life safety systems will be provided. The work includes removal and replacement of chemical process tanks, equipment, piping, and controls for the following 10 processes/processing lines: Electroless Nickel; Cadmium Plating; Chrome and HVOF Strip; Chrome Plating; Anodize/Alodine/Iridite (Type II and Type III); Zinc Nickel Plating; Nickel Sulfamate Plating; Phosphate, Passivate and Titanium Pickle; Fluorescent Penetrant Inspection (FPI); and Temper Etch and Aqueous Degrease. CONSTRUCTION. A Pre-Engineered metal building (PEMB) will be constructed to encompass plating line elements that extend from the side of B505.[RLTCUC(3] The PEMB will be approximately 2,800-square-feet with basement, operating floor, equipment platforms and steel stairs. The PEMB construction includes insulated steel metal panels, a standing seam metal roof, polyisocyanurate insulation, gutters, downspouts, and snow guards. The PEMB will be located for access from B505. Access from B505 will be created by removing gypsum board infill, metal studs, and existing masonry. An expansion joint will be placed between the new PEMB and B505. The project is planned to be executed in four (4) consecutive phases to ensure the plating shop remains fully operational throughout construction. The project is located at Hill Air Force Base, Utah. In accordance with Federal Acquisition Regulation (FAR) 236.204(iii) the Government currently estimates the magnitude of construction for this project to be between $100,000,000 and $250,000,000. This project is estimated to be solicited approximately Aug 2024 with construction completed within 55 months of award. When: Wednesday, 17 April 2024 Time: 0900 - 1100 MDT (UT Satellite Office); 1330 - 1430 MDT (Site Visit - B505, Hill AFB) Where: U.S. Army Corps of Engineers, Sacramento District - Utah Satellite Office 523 S. Heritage Park Blvd, Suite 1, Layton, UT 84041 The information below is requested for each interested attendee by 1200 PDT on 25 March 2024. Name Company Email Address Please provide the information via email to: Thomas L. Cochran, thomas.cochran@usace.army.mil and Amelia K. Bryant, amelia.k.bryant@usace.army.mil Please include the Industry Day Plating Solicitation number, W9123824S0011, in the subject line. Draft Solicitation/Request For Proposal (DRFP): A copy of the DRFP is attached Feedback/questions/comments are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet 1. To submit and review questions/comments, contractors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the QUICK ADD link. Select agency as USACE and enter the Bidder Inquiry Key for this notice listed below, your e-mail address, and then click continue. Fill in all required information and click Add User. 2. From this page you may view all questions or add an inquiry. 3. Contractors will receive an acknowledgement of their question via e-mail 4. The Notice number is: W9123824S0011 The Bidder Inquiry Key is: QTZHMY-N6Q3FG The Bidder Inquiry System will be unavailable for new inquiries/comments after 24 April 2024 at 1300 These documents are for information and planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition. Potential offerors are encouraged to comment on all aspects of the DRFP, and identify any areas that are confusing or ambiguous, which may warrant additional information or clarification in the final document, including the requirements, schedules, phasing, proposal instructions, Project Labor Agreement requirement and evaluation approaches associated with performance of the work. Potential offerors should identify any unnecessary or inefficient requirements and are also encouraged to comment on the Contract Line Item Number (CLIN) structure, any unique terms and conditions, subcontracting goals, reasonableness of the past performance relevance factor as it relates to scope, magnitude and complexity. *Information received will be reviewed by the Government team. We will not be providing any responses to questions at this time, nor will feedback/comments received through ProjNet or email. Information received will be reviewed by the Government team and used in developing the final project. A question-and-answer session will be conducted during the industry day. THIS IS NOT A SOLICITATION, no proposals will be accepted, and no award will be made from this notice. Responses to this notice are strictly voluntary. The Government will not reimburse any party attending or participating for costs incurred for this event or marketing efforts. The Government assumes no financial responsibility for any costs incurred. UNSOLICITED PROPOSALS OR OFFERS OF ANY KIND WILL NOT BE CONSIDERED IN RESPONSE TO THIS NOTICE. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$150,000,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
33
Bidding Soon
542
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

img_map_placeholder

To Be Determined, Hill Air Force Base, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.