BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Beaufort, North Carolina. Completed plans call for site work for a water / sewer project.

Dredge approximately cubic yards 1,800 (CY) by bucket to barge system from the Salters Creek Boat Access Area Channel as shown in the construction drawings. The dredge spoil material shall be placed within the proposed material disposal site located by the Contractor Executed contract documents, insurance certifications and, upon completion and acceptance of the work, invoices and other information requested are to be sent to: Eugene Foxworth Assistant County Manager Carteret County Administration Building 210 Turner St. Beaufort, NC 28516 Where items of equipment or material carry a manufacturer's warranty for any period in excess of twelve (12) months, then the manufacturer's warranty shall apply for that particular piece of equipment or material. The contractor shall replace such defective equipment tor materials, without cost to the owner, within the manufacturer's warranty period. The Contractor shall commence work under this Contract on a date to be specified in written order from the County and shall fully complete all work as follows: Complete all in-water dredging activities by March 31, 2023. Complete all work items (FINAL COMPLETION) as agreed to by the Disposal Site owner. Contractor and Owner recognize that time is of the essence and that Owner will suffer financial loss if the Work is not completed within the times specified above, plus any extension thereof allowed in accordance with the Contract Documents. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Works is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but no as a penalty), in the event the Contractor does not complete at least the work, in the time allotted under TIME OF COMPLETION above, the Contractor shall pay a sum of $1,000 / day for each day the work continues until finished. Liquidated damages shall only apply to the in water dredging activities (work). A performance and payment bond are required.

Award

Water / Sewer

$144,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
16
Bidding Soon
271
All Active Projects
120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

March 13, 2023

img_map_placeholder

To Be Determined, Beaufort, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.