BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Bend, Oregon. Completed plans call for the renovation of a municipal facility.

Pre Bid Conference: None Bulletin Desc: The purpose of this ITB is to establish a Contract for constructing frontage improvements along Mervin Sampels and O.B. Riley Roads for the benefit of ODOT. The work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents. Permits for Phase 3 and Phase 4 work are currently in the City of Bend permit approval process, separately. The permit for Phase 3 work is estimated to be issued by the City of Bend by 3/24/2023. The permit for the Phase 4 work is estimated to be issued by the City of Bend by 4/14/2023. At issuance of Notice to Proceed the awarded contractor can proceed with Phase 3 work and any other work not related to the Phase 4 permit. Phase 4 work can begin once the permit is issued. All work must be performed by contractors who are on the City of Bend's list of qualified contractors per the City of Bend Right of Way Code section 3.40.020. Portland Phone Conference ID: 285 483 675# Owner Authorized Representative (Project Manager): Scott Stewart 63055 N. Hwy 97 Bend, OR 97703 Phone: (541) 285-7513 Email: Scott.g.stewart@odot.oregon.gov Blanket/Contract Begin Date: 03/13/2023 Blanket/Contract End Date: 06/30/2023 The selected Bidder shall furnish a Performance Bond and a Payment Bond each in the total amount (100%) of the awarded Contract Price, executed in favor of the State of Oregon, to ensure faithful performance of the Contract and payment for labor and materials. Bidder may submit a cashier's check or certified check in lieu of all or a portion of the required performance bond. If Bidder plans to submit a cashier's check or certified check in lieu of the required bonds, please contact the Single Point of Contact for instructions. 4 If Bid security is furnished by means of a certified or cashier's check, Bidder must notify the Single Point of Contact for submittal instructions. Bid security must be received by the Single Point of Contact before the Closing. Failure to achieve Substantial Completion by the time specified above for Substantial Completion will result in damage to the State of Oregon. Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $600.00 per calendar day for each day elapsed in excess of the Substantial Completion date specified in Section 3 of this Agreement until Substantial Completion is achieved.

Award

Municipal

$425,642.00

Public - State/Provincial

Renovation

28

6

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
7
Bidding Soon
138
All Active Projects
53
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.