Site work for a water / sewer project in Santa Clara, California. Completed plans call for site work for a water / sewer project.
The Work shall consist of replacing or rehabilitating sanitary sewer mains at 41 pipeline segments as shown on the Plans [29 Base Bid pipeline segments; six (6) Alternate A Bid pipeline segments and six (6) Alternate B Bid pipeline segments]. The project requires coordination with the Union Pacific Railroad (UPRR) and San Francisco Public Utilities Commission (SFPUC) as indicated in the Contract Documents. The Work is generally comprised of the following features: 1. Cured-in-place-pipe (CIPP) lining rehabilitation of 1,294 +/- feet of 14-inch to 20-inch sanitary sewer main, 2,314 +/- feet of 21-inch to 24-inch sanitary sewer main, 1,348 +/- feet of 25-inch to 30-inch sanitary sewer main, 1,791 +/- feet of 31-inch to 36-inch sanitary sewer main, and 4,615 +/- feet of 42-inch sanitary sewer main. 2. Cured-in-place-pipe (CIPP) spot lining rehabilitation of 15-inch sanitary sewer main. 3. Slip lining rehabilitation of 146 +/- feet of 15-inch sanitary sewer main with new 12-inch HDPE sanitary sewer pipe. 4. Open Cut replacement of 99 +/- feet of 14-inch to 16-inch sanitary sewer main with new 14-inch to 16-inch PVC sanitary sewer main, 1,065 +/- feet of 18-inch sanitary sewer main with new 18-inch PVC sanitary sewer main, and 26 +/- feet of 24-inch sanitary sewer main with new 24-inch PVC sanitary sewer main. 5. Pipe Reaming replacement of 767 +/- feet of 14-inch to 16-inch sanitary sewer with new 14-inch to 16-inch HDPE sanitary sewer main. 6. Point repairs to 14-inch to 18-inch existing sanitary sewer mains. 7. Infiltration Grout repairs at joints on existing 15-inch to 42-inch VCP and RCP sanitary sewer mains. 8. 22 +/- sanitary sewer lateral reconnections 9. Removal and replacement of 7 +/- existing sanitary sewer manholes. 10. Replacement of 2 +/- manhole frame and covers. 11. Installation of 1 +/- 48-inch concrete sanitary manhole 12. Connection to existing or replaced sanitary sewer manholes. 13. Sanitary sewer flow bypassing. Scope of work also includes mobilization/demobilization, traffic control, potholing of utilities, shoring and bracing, permitting and agency coordination, and other incidentals necessary for complete and usable facilities. The Work shall reach Substantial Completion within one hundred seventy (170) Working Days from the date when the Contract Time commences to run. The Work shall reach Final Completion within one hundred eighty-five (185) Working Days from the date when the Contract Time commences to run. See Document 00050, References and Definitions, for definitions of Substantial Completion and Final Completion. REQUIRED CONTRACTOR'S LICENSE(S). A California "A" contractor's license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. PRE-BID CONFERENCE AND SITE VISIT. City will not conduct a Pre-Bid Conference and Site Visit for this project. Bidders are strongly encouraged to visit the site. STATEMENT OF QUALIFICATIONS. Each Bidder shall be required to submit a Statement of Qualifications in accordance with Document 00200, Instructions to Bidders, and Document 00450, Statement of Qualifications for Construction Work
Award
Water / Sewer
$5,178,003.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2023
May 22, 2023
Multiple Locations, Santa Clara, CA
Related To This Project
Santa Clara, CA
Bid Date: Mar 01 2023
Santa Clara, CA
Bid Date: Mar 01 2023
Santa Clara, CA
Bid Date: May 26 2023
Santa Clara, CA
Bid Date: Apr 06 2023
Santa Clara, CA
Bid Date: Mar 24 2023
Santa Clara, CA
Bid Date: Mar 24 2023
Santa Clara, CA
Bid Date: Apr 05 2023
Santa Clara, CA
Bid Date: Apr 12 2023
Santa Clara, CA
Bid Date: Mar 10 2023
Santa Clara, CA
Bid Date: Mar 17 2023
Santa Clara, CA
Bid Date: Mar 10 2023
Santa Clara, CA
--
Santa Clara, CA
Bid Date: May 26 2023
Santa Clara, CA
Bid Date: Jan 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.