BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Santa Clara, California. Completed plans call for site work for a water / sewer project.

The Work shall consist of replacing or rehabilitating sanitary sewer mains at 41 pipeline segments as shown on the Plans [29 Base Bid pipeline segments; six (6) Alternate A Bid pipeline segments and six (6) Alternate B Bid pipeline segments]. The project requires coordination with the Union Pacific Railroad (UPRR) and San Francisco Public Utilities Commission (SFPUC) as indicated in the Contract Documents. The Work is generally comprised of the following features: 1. Cured-in-place-pipe (CIPP) lining rehabilitation of 1,294 +/- feet of 14-inch to 20-inch sanitary sewer main, 2,314 +/- feet of 21-inch to 24-inch sanitary sewer main, 1,348 +/- feet of 25-inch to 30-inch sanitary sewer main, 1,791 +/- feet of 31-inch to 36-inch sanitary sewer main, and 4,615 +/- feet of 42-inch sanitary sewer main. 2. Cured-in-place-pipe (CIPP) spot lining rehabilitation of 15-inch sanitary sewer main. 3. Slip lining rehabilitation of 146 +/- feet of 15-inch sanitary sewer main with new 12-inch HDPE sanitary sewer pipe. 4. Open Cut replacement of 99 +/- feet of 14-inch to 16-inch sanitary sewer main with new 14-inch to 16-inch PVC sanitary sewer main, 1,065 +/- feet of 18-inch sanitary sewer main with new 18-inch PVC sanitary sewer main, and 26 +/- feet of 24-inch sanitary sewer main with new 24-inch PVC sanitary sewer main. 5. Pipe Reaming replacement of 767 +/- feet of 14-inch to 16-inch sanitary sewer with new 14-inch to 16-inch HDPE sanitary sewer main. 6. Point repairs to 14-inch to 18-inch existing sanitary sewer mains. 7. Infiltration Grout repairs at joints on existing 15-inch to 42-inch VCP and RCP sanitary sewer mains. 8. 22 +/- sanitary sewer lateral reconnections 9. Removal and replacement of 7 +/- existing sanitary sewer manholes. 10. Replacement of 2 +/- manhole frame and covers. 11. Installation of 1 +/- 48-inch concrete sanitary manhole 12. Connection to existing or replaced sanitary sewer manholes. 13. Sanitary sewer flow bypassing. Scope of work also includes mobilization/demobilization, traffic control, potholing of utilities, shoring and bracing, permitting and agency coordination, and other incidentals necessary for complete and usable facilities. The Work shall reach Substantial Completion within one hundred seventy (170) Working Days from the date when the Contract Time commences to run. The Work shall reach Final Completion within one hundred eighty-five (185) Working Days from the date when the Contract Time commences to run. See Document 00050, References and Definitions, for definitions of Substantial Completion and Final Completion. REQUIRED CONTRACTOR'S LICENSE(S). A California "A" contractor's license is required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. PRE-BID CONFERENCE AND SITE VISIT. City will not conduct a Pre-Bid Conference and Site Visit for this project. Bidders are strongly encouraged to visit the site. STATEMENT OF QUALIFICATIONS. Each Bidder shall be required to submit a Statement of Qualifications in accordance with Document 00200, Instructions to Bidders, and Document 00450, Statement of Qualifications for Construction Work

Award

Water / Sewer

$5,178,003.00

Public - City

Site Work

48

14

6

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
78
Bidding Soon
1,510
All Active Projects
636
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

May 22, 2023

img_map_placeholder

Multiple Locations, Santa Clara, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.