BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Scottsboro, Alabama. Completed plans call for the renovation of a educational facility.

Plans and specifications are for viewing purposes only. Official sets must be obtained from McKee and Associates. Project No: 22.264 Project Locations: 29333 AL-71 Bryant, AL 35958 45549 AL-277 Stevens on, AL 35772 The project shall be bid excluding taxes. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. No bid may be withdrawn after scheduled closing for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. All Bidders shall have general liability and workman's compensation insurance. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect. All bidders shall show such evidence by clearly displaying current license number on the outside of the sealed envelope in which the proposal is delivered. Scope of Work, the General Contractor MUST state his/her completion time on their Bid Proposal Form. The Contractor's Completion Time will be taken into consideration for award of the construction contract. The General Contractor MUST use this Completion Time Form to state his/her completion time. This Form MUST be submitted with the sealed Proposal. The Contract is meant to be viewed as a successor to the General Special Conditions of the Contract. Should any discrepancy or ambiguity be noted, the Scope of the Work of the Contract shall apply and the General Special Conditions of the Contract shall defer to Scope of the Work of the Contract Documents. The scope of the work shall be taken in its entirety by all contractors. In signing the contract all contractors have read and understand that the Scope of the Work and the General Special Conditions are taken in their entirety. A. The work includes construction of the water distribution system including fire lines as shown on the Drawings. B. Testing and disinfection of the installed system shall be incidental to the work.

Award

Educational

$798,700.00

Public - County

Renovation

23

19

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
40
Bidding Soon
594
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

April 17, 2023

img_map_placeholder

Multiple Locations, Scottsboro, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.