BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Parker, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of April 6 the project was awarded to Elite Surface Infrastructure for $2,240,061.05 PROJECT NUMBER CIP 22-041-CI Bids Must Be Accompanied by a Bid Bond in an Amount of at Least Five Percent (5%) of the Bid. The Vendors Can Upload Their Bid Bond When Responding Online. The Bond Will Be Retained by the Town as Liquidated Damages if the Successful Bidder Refuses or Fails to Enter Into a Contract and Performance, Payment and Maintenance Bond in Accordance With His Bid When Notified of the Award. All Bidders Questions and Inquires Shall Be Directed to Felsburg Holt & Uliveg S Project Manager, Tom Anzia at Tom.anzia@fhueng.com. Last Day for Questions is March 3, 3023 and Final Addendum to Be Posted March 8, 2023. Tom Williams, Pe, Engineering/public Works Director This Notice to Bidders is Not Valid Without the Above Signature. Notice to Nonresident Bidders the Purpose of This Notice is to Comply With C.r.s. 8-19-104(3). If a Nonresident Bidder is From a State That Provides a Bidding Preference to Bidders From That State, Then a Comparable Percentage Disadvantage Will Be Applied to the Bid of That Nonresident Bidder. Nonresident Bidders May Obtain Additional Information From the Web Site for the Colorado Department of Labor and Employment.' Scope- The work generally includes removals; earthwork; concrete sidewalk, curb ramps and pavement; curb & gutter; drainage improvements; pedestrian lighting; traffic control; signing & striping; landscape restoration and all incidental work. The contractor shall Substantially Complete all landscape restoration work on or before September 30, 2023, and shall Substantially Complete the remainder of all salient work items on or before October 31, 2023. Final Completion including but not limited to non-salient work items, punch list, site cleanup and demobilization shall be complete on or before November 15, 2023

Award

Sidewalks / Parking Lot

$2,240,061.00

Public - City

Paving, Site Work

164

7

4

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
54
Bidding Soon
986
All Active Projects
404
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.