BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Cincinnati, Ohio. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

*As of October 12, 2023, the project, which is a progressive design build project, is still in the design development phase. The next phase, which is the physical construction itself, does not have a firm timeline yet, but is estimated to start at least after a year from now. Brent Spence Bridge Corridor Solicitation : 233000 PID : 116649 Proposal no: HAM116649 A portion of the Work conducted in conjunction with the Project will include the rehabilitation and reconfiguration of the existing Brent Spence Bridge, reducing the number of lanes on each deck from four lanes to three lanes and significantly increasing the inside and outside shoulder widths Design-Build Contractor Notice to Proceed (NTP) : July 15, 2023 Completion of the Contract Deadline : November 1, 2030 Collector-Distributor (CD) Road systems will be constructed with the Project; one CD Road to connect I-71/I-75 traffic to and from the local street network between West 12th Street (southbound at 5th Street) in Covington, Kentucky and Ezzard Charles Drive in Cincinnati, Ohio, and one CD Road between south of Dixie Highway and north of Kyles Lane in both directions Should a question arise at any time during any portion of the Procurement Process, the Offeror may seek clarification by submitting a clarification question using the Departments Pre-Bid website (referencing Project Number 233000) The DBE goal for Phase 1 (Preconstruction Phase including Sub-Phase 1A and Sub-Phase 1B) is 9% of the Sub-Phase 1A and Sub-Phase 1B Contract Price. The Department is targeting a DBE goal of at least 7% of the Contract Price for Phase 2. The DBE goal for Phase 2 will be agreed upon between the Contractor and the Department and finalized by the Department as part of the Phase 2 Change Order.

Award

Bridges / Tunnels

$230,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

1

11

316

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
55
Bidding Soon
1,306
All Active Projects
575
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2023

February 3, 2025

img_map_placeholder

Multiple Locations, Cincinnati, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.